Pulling the wage determination…
Revision 2 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Missouri: Pettis. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0027-004 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $45.60 | $35.47 |
| BRMO0011-001 | BRICKLAYER | $32.79 | $21.31 |
| CARP0010-001 | CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $31.51 | $22.25 |
| SUMO2010-016 | CEMENT MASON/CONCRETE FINISHER | $17.95 | $6.64 |
| ELEC0124-019 | ELECTRICIAN(INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS) | $51.01 | $26.25 |
| ELEV0012-001 | ELEVATOR MECHANIC. A. VACATIONEMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS AND 6% FOR 6 MONTHS TO 5 YEARS AS VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $60.69 |
| $38.44 |
| SUMO2010-016 | GLAZIER | $22.71 | $0.00 |
| IRON0010-023 | IRONWORKERREINFORCING AND STRUCTURAL | $39.00 | $34.25 |
| LABO0663-001 | LABORER(BRICK MASON TENDER) | $28.00 | $13.18 |
| LABO0663-001 | LABORER(LANDSCAPE) | $26.50 | $13.18 |
| SUMO2010-016 | LABORERCOMMON OR GENERAL | $17.98 | $7.28 |
| SUMO2010-016 | OPERATORBACKHOE/TRACKHOE | $23.55 | $7.47 |
| SUMO2010-016 | OPERATORWATER TRUCK | $28.37 | $0.00 |
| SUMO2010-016 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.47 | $0.00 |
| PAIN0003-015 | PAINTER(DRYWALL FINISHING/TAPING ONLY) | $25.39 | $17.76 |
| PAIN0003-015 | PAINTER(BRUSH & ROLLER ONLY) | $24.43 | $17.76 |
| SUMO2010-016 | PAINTERSPRAY | $18.79 | $8.12 |
| PLUM0533-008 | PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $57.51 | $28.35 |
| PLUM0008-011 | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $58.38 | $25.29 |
| ENGI0101-012 | POWER EQUIPMENT OPERATORGRADER/BLADE | $45.48 | $22.42 |
| ENGI0101-012 | POWER EQUIPMENT OPERATORROLLER | $45.48 | $22.42 |
| ENGI0101-012 | POWER EQUIPMENT OPERATOR(LOADER) | $45.48 | $22.42 |
| ROOF0020-001 | ROOFER | $38.45 | $22.29 |
| SUMO2010-016 | SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $30.08 | $9.91 |
| SHEE0002-024 | SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $47.20 | $26.28 |
| BRMO0011-001 | TILE SETTER | $32.79 | $21.31 |
| SUMO2010-016 | TRUCK DRIVERDUMP TRUCK | $28.92 | $0.00 |