Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Missouri: Lawrence. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0063-002 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $31.97 | $14.00 |
| BRMO0015-004 | BRICKLAYER | $33.67 | $19.48 |
| CARP0311-004 | CARPENTER(DRYWALL HANGING, FORM WORK & METAL STUD INSTALLATION ONLY) | $29.50 | $21.50 |
| SUMO2010-012 | CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $18.22 | $7.85 |
| SUMO2010-012 | CEMENT MASON/CONCRETE FINISHER | $17.95 | $6.64 |
| ELEC0095-007 | ELECTRICIAN(INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS) | $32.25 | $20.81 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| ELEV0012-001 | ELEVATOR MECHANIC. A. VACATIONEMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS AND 6% FOR 6 MONTHS TO 5 YEARS AS VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY | $60.69 | $38.44 |
| SUMO2010-012 | GLAZIER | $20.26 | $2.45 |
| IRON0010-004 | IRONWORKERREINFORCING AND STRUCTURAL | $36.00 | $34.25 |
| LABO0663-007 | LABORER(LANDSCAPE) | $27.05 | $13.62 |
| SUMO2010-012 | LABORERCOMMON OR GENERAL | $14.99 | $6.99 |
| SUMO2010-012 | LABORERMASON TENDER - BRICK | $15.80 | $7.31 |
| SUMO2010-012 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.47 | $0.00 |
| SUMO2010-012 | OPERATORBACKHOE/TRACKHOE | $19.80 | $7.47 |
| SUMO2010-012 | OPERATORWATER TRUCK | $28.37 | $0.00 |
| PAIN2015-005 | PAINTERDRYWALL FINISHING/TAPING ONLY (DADE, DOUGLAS, HICKORY, OZARK, ST. CLAIR, STONE, & TANEY COUNTIES) | $25.79 | $15.35 |
| SUMO2010-012 | PAINTERSPRAY | $18.79 | $8.12 |
| PLUM0178-009 | PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $39.35 | $15.72 |
| SUMO2010-012 | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $22.25 | $9.77 |
| ENGI0101-008 | POWER EQUIPMENT OPERATOR(LOADER) | $31.62 | $18.07 |
| ENGI0101-008 | POWER EQUIPMENT OPERATORGRADER/BLADE | $31.62 | $18.07 |
| ENGI0101-008 | POWER EQUIPMENT OPERATORBULLDOZER | $31.62 | $18.07 |
| ENGI0101-008 | POWER EQUIPMENT OPERATORROLLER | $30.91 | $18.07 |
| ROOF0020-003 | ROOFER | $30.73 | $14.51 |
| SHEE0036-029 | SHEETMETAL WORKER(HVAC DUCT AND UNIT INSTALLATION ONLY) | $34.43 | $17.86 |
| SUMO2010-012 | SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $23.31 | $9.05 |
| BRMO0015-018 | TILE SETTER | $26.47 | $14.89 |
| SUMO2010-012 | TRUCK DRIVERDUMP TRUCK | $28.92 | $0.00 |