Revision 2 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Missouri: Johnson. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0027-004 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $45.60 | $35.47 |
| BRMO0015-010 | BRICKLAYER | $39.85 | $21.70 |
| CARP0005-014 | CARPENTER(DRYWALL HANGING, FORM WORK & METAL STUD INSTALLATION ONLY) | $42.06 | $22.40 |
| SUMO2010-011 | CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $23.33 | $7.42 |
| SUMO2010-011 | CEMENT MASON/CONCRETE FINISHER | $17.95 | $6.64 |
| ELEC0124-019 | ELECTRICIAN(INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS) | $51.01 | $26.25 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| ELEV0012-001 | ELEVATOR MECHANIC. A. VACATIONEMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS AND 6% FOR 6 MONTHS TO 5 YEARS AS VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY | $60.69 | $38.44 |
| SUMO2010-011 | GLAZIER | $22.71 | $0.00 |
| IRON0010-030 | IRONWORKERREINFORCING AND STRUCTURAL | $39.00 | $34.25 |
| LABO0663-001 | LABORER(BRICK MASON TENDER) | $28.00 | $13.18 |
| LABO0663-001 | LABORER(LANDSCAPE) | $26.50 | $13.18 |
| SUMO2010-011 | LABORERCOMMON OR GENERAL | $16.18 | $7.12 |
| SUMO2010-011 | OPERATORWATER TRUCK | $28.37 | $0.00 |
| SUMO2010-011 | OPERATORBACKHOE/TRACKHOE | $23.55 | $7.47 |
| SUMO2010-011 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.47 | $0.00 |
| PAIN0003-018 | PAINTER(DRYWALL FINISHING/TAPING ONLY) | $31.74 | $17.76 |
| PAIN0003-018 | PAINTER(BRUSH & ROLLER ONLY) | $30.54 | $17.76 |
| SUMO2010-011 | PAINTERSPRAY | $18.79 | $8.12 |
| PLUM0533-008 | PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $57.51 | $28.35 |
| PLUM0008-001 | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $58.38 | $25.29 |
| ENGI0101-012 | POWER EQUIPMENT OPERATORROLLER | $45.48 | $22.42 |
| ENGI0101-012 | POWER EQUIPMENT OPERATOR(LOADER) | $45.48 | $22.42 |
| ENGI0101-012 | POWER EQUIPMENT OPERATORGRADER/BLADE | $45.48 | $22.42 |
| ROOF0020-001 | ROOFER | $38.45 | $22.29 |
| SHEE0002-014 | SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $50.43 | $26.96 |
| BRMO0003-005 | TILE SETTER | $40.53 | $15.99 |
| SUMO2010-011 | TRUCK DRIVERDUMP TRUCK | $28.92 | $0.00 |