Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 3 counties in Minnesota: Cook, Koochiching, Lake. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0049-006 | ASBESTOS WORKERS/INSULATOR(INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) | $53.18 | $23.83 |
| BOIL0647-002 | BOILERMAKER | $48.00 | $31.14 |
| BRMN0003-002 | BRICKLAYER(COOK, LAKE) | $42.19 | $31.19 |
| BRMN0015-002 | BRICKLAYER(KOOCHICHING COUNTY) | $39.35 | $26.73 |
| CARP0361-001 | CARPENTER(COOK, LAKE (SOUTH PART, EXCLUDING SAWBILL LANDING)) | $31.52 | $17.64 |
| CARP0606-011 | CARPENTER(KOOCHICHING, LAKE (NORTHERN PART, INCLUDING SAWBILL LANDING)) |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $28.29 |
| $22.88 |
| BRMN0015-004 | CEMENT MASON/CONCRETE FINISHER(KOOCHICHING COUNTY) | $39.35 | $26.73 |
| PLAS0633-065 | CEMENT MASON/CONCRETE FINISHER(COOK, LAKE) | $39.91 | $21.63 |
| ELEC0110-006 | COMMUNICATIONS SYSTEM, SOUND, SIGNAL & COMMUNICATIONS WORKTECHNICIAN (INSTALLATION OF CONTROLLER). FOOTNOTES: A. 1 YEAR SERVICE - 5 DAYS PAID VACATION; 2 YEARS SERVICE - 10 DAYS PAID VACATION; 5 YEARS SERVICE - 12 DAYS PAID VACATION; 7 YEARS SERVICE - 14 DAYS PAID VACATION; 9 YEARS SERVICE - 16 DAYS PAID VACATION; 11 YEARS SERVICE - 18 DAYS PAID VACATION; 12 YEARS SERVICE - 20 DAYS PAID VACATION B. 8 PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; 4TH OF JULY; LABOR DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; THE NORMAL WORK DAY PRECEDING CHRISTMAS DAY | $38.97 | $17.14 |
| ELEC0110-006 | COMMUNICATIONS SYSTEM, SOUND, SIGNAL & COMMUNICATIONS WORKINSTALLER. FOOTNOTES: A. 1 YEAR SERVICE - 5 DAYS PAID VACATION; 2 YEARS SERVICE - 10 DAYS PAID VACATION; 5 YEARS SERVICE - 12 DAYS PAID VACATION; 7 YEARS SERVICE - 14 DAYS PAID VACATION; 9 YEARS SERVICE - 16 DAYS PAID VACATION; 11 YEARS SERVICE - 18 DAYS PAID VACATION; 12 YEARS SERVICE - 20 DAYS PAID VACATION B. 8 PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; 4TH OF JULY; LABOR DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; THE NORMAL WORK DAY PRECEDING CHRISTMAS DAY; & CHRISTMAS DAY | $27.30 | $14.31 |
| ELEC0242-019 | ELECTRICIAN(COOK, LAKE) | $47.46 | $33.34 |
| ELEC0294-014 | ELECTRICIANS: (2) ALL OTHER WORK (KOOCHICHING) | $45.83 | $32.90 |
| ELEC0294-014 | ELECTRICIANS: (1) UP TO & INCLUDING 6-PLEX UNDER ONE ROOF (KOOCHICHING) | $39.18 | $29.68 |
| ELEV0009-001 | ELEVATOR MECHANIC FOOTNOTEA.PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. B.PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY | $62.52 | $38.44 |
| PAIN0106-018 | GLAZIERFOOTNOTE: 1 TO 4 YEARS' SERVICE - 1 WEEK'S PAID VACATION; 5 TO 11 YEARS SERVICE - 2 WEEKS PAID VACATION; 11 OR MORE YEARS SERVICE - 3 WEEKS PAID VACATION | $30.17 | $17.47 |
| IRON0512-037 | IRONWORKER | $39.14 | $34.11 |
| LABO1097-019 | LABORER GROUP 1(KOOCHICHING) | $20.62 | $16.25 |
| LABO1097-019 | LABORER GROUP 2(KOOCHICHING) | $21.02 | $16.25 |
| LABO1097-019 | LABORER GROUP 3(KOOCHICHING) | $21.32 | $16.25 |
| LABO1097-019 | LABORER GROUP 4(KOOCHICHING) | $22.62 | $16.25 |
| LABO1091-017 | LABORERSGROUP 1 GENERAL; CARPENTER TENDER; CONCRETE LABORER; DAMP PROOFER BELOW GRADE; DRILL RUNNER TENDER; DUMPMAN - DIRT, ASPHALT, CONCRETE, CEMENT; HEATER TENDER; HOT TAR CAULKER - CORKER; JOIST HANDLER; REBAR; SNOW BLOWER OPERATOR; SIGNALPERSON; MATERIAL HANDLER (ALL TYPES POWER BUGGY); FIRE CONTROL; ASBESTOS REMOVAL; & HAZARDOUS WASTE, FLAG PERSON (COOK, LAKE) | $29.92 | $21.69 |
| LABO1091-017 | LABORERSGROUP 4 DRILLER FOR BLASTING PURPOSES; DYNAMITE BLASTERS OR SUBSTITUTE PRODUCTS TOVEX TR, WATER, GAS, GEL, BRISTAR, SILENT DYNAMITE, ETC.; ASBESTOS ABATEMENT WORKER; & HAZARDOUS WASTE WORKER (COOK, LAKE) | $30.62 | $21.69 |
| LABO1091-017 | LABORERSGROUP 3 CAISSON WORK; NOZZLE OPERATOR - GUNITE, CEMENT, SANDBLASTING; PIPELAYER; REFRACTORY WORKER; SHEETING SETTER & DRIVER, HEAVY BUILDING EXCAVATION; UNDERGROUND WORK - OPEN DITCH OR EXCAVATION 8' BELOW GRADE; UNDERPINNING; & HOD CARRIER (COOK, LAKE) | $30.32 | $21.69 |
| LABO1091-017 | LABORERSGROUP 2 CHAIN SAW OPERATOR; CONCRETE SAW, DRILL OPERATOR; CONCRETE VIBRATOR; DEMOLITION & WRECKING, EXCLUDING REMODELING; GUNITE, SANDBLASTING MACHINE OPERATOR; MASON TENDER; MORTAR MIXER - CEMENT OR ANY OTHER SUBSTITUTE MATERIAL OR COMPOSITION; PIPE HANDLER; PNEUMATIC & ELECTRIC TOOLS,JACKHAMMER, PAVING BUSTER, CHIPPING HAMMER, TAMPER OPERATOR, ETC.; SWING STAGE LINE SCAFFOLD (NOT INCLUDING ""PATENT"" SCAFFOLDING); TORCHMAN - GAS, ELECTRIC, THERMAL OR SIMILAR DEVICE; & HYDROBLAST (COOK, LAKE) | $30.07 | $21.69 |
| LABO1091-003 | LANDSCAPE LABORER(COOK AND LAKE COUNTIES) | $26.89 | $19.31 |
| LABO1097-001 | LANDSCAPE LABORER(KOOCHICHING COUNTY) | $26.89 | $19.31 |
| CARP0361-022 | LATHER | $33.55 | $26.08 |
| BRMN0001-004 | MARBLE SETTER | $45.47 | $26.33 |
| CARP1348-005 | MILLWRIGHT(COOK, KOOCHICHING, LAKE) | $40.55 | $27.36 |
| ENGI0049-003 | OPERATORPOWER EQUIPMENT GROUP 1 HELICOPTER OPERATOR; TRUCK & CRAWLER CRANE WITH 200' OF BOOM & OVER, INCLUDING JIB ($.50 PREMIUM WITH 300' OF BOOM & OVER, INCLUDING JIB); & TOWER CRANE 250' & OVER | $49.25 | $25.20 |
| ENGI0049-003 | OPERATORPOWER EQUIPMENT GROUP 8 MECHANICAL SPACE HEATER (TEMPORARY HEAT); OILER OR GREASER; & ELEVATOR OPERATOR | $39.88 | $25.20 |
| ENGI0049-003 | OPERATORPOWER EQUIPMENT GROUP 7 AIR COMPRESSOR OPERATOR 600 CFM OR OVER; PUMP AND/OR CONVEYOR OPERATOR; BRAKEMAN; PICK-UP SWEEPER (1 CU. YD. & OVER HOPPER CAPACITY); TRUCK CRANE OILER; & WELDING MACHINE OPERATOR, FIREMAN TEMPORARY HEAT | $42.06 | $25.20 |
| ENGI0049-003 | OPERATORPOWER EQUIPMENT GROUP 6 CONCRETE BATCH PLANT OPERATOR; GUNITE OPERATOR; TRACTOR OPERATOR D2 OR SIMILAR SIZE; & FRONT END LOADER OPERATOR, UP TO 1 CU. YD | $43.28 | $25.20 |
| ENGI0049-003 | OPERATORPOWER EQUIPMENT GROUP 5 AIR COMPRESSOR OPERATOR 450 CFM OR OVER (2 OR MORE MACHINES); PUMP OPERATOR AND/OR CONVEYOR OPERATOR (2 OR MORE MACHINES); MECHANIC; PUMPCRETE OR COMPLACO TYPE MACHINE OPERATOR; FORKLIFT; BOOM TRUCK UP TO 100 FT.; CONCRETE MIXER OPERATOR; DRILL RIG - HEAVY ROTARY OR CHURN WHEN USED FOR CAISSON DRILLING FOR ELEVATOR CYLINDER OR BUILDING CONSTRUCTION; FRONT END LOADER (OVER 1 CU. YD.); HOIST ENGINEER (1 OR 2 DRUMS); STRADDLE CARRIER OPERATOR; POWER PLANT ENGINEER (100 KW & | $44.91 | $25.20 |
| ENGI0049-003 | OPERATORPOWER EQUIPMENT GROUP 4 CRAWLER BACKHOE; HOIST ENGINEER (3 DRUMS OR MORE); LOCOMOTIVE OPERATOR; OVERHEAD CRANE OPERATOR (INSIDE BUILDING PERIMETER); & TRACTOR OPERATOR WITH BOOM | $46.99 | $25.20 |
| ENGI0049-003 | OPERATORPOWER EQUIPMENT GROUP 3 TRAVELING TOWER CRANE; MASTER MECHANIC; PILE DRIVING OPERATOR (WHEN 3 DRUMS ARE USED); TRUCK & CRAWLER CRANE, UP TO BUT NOT INCLUDING 150' OF BOOM, INCLUDING JIB; DERRICK (GUY & STIFFLEG); TOWER CRANE (STATIONARY) UP TO 200'; & ALLTERRAIN VEHICLE CRANE, BOOM TRUCK OVER 100 FT | $47.35 | $25.20 |
| ENGI0049-003 | OPERATORPOWER EQUIPMENT GROUP 2 TRUCK & CRAWLER CRANE WITH 150' OF BOOM, UP TO BUT NOT INCLUDING 200' OF BOOM, INCLUDING JIB; & TOWER CRANE 200' & OVER, CONCRETE PUMP 164 FT BOOM | $48.88 | $25.20 |
| PAIN0106-017 | PAINTER(PAPERHANGING; SPRAY; STEEL; TAPING; & LEAD BASE PAINT REMOVAL & ABATEMENT WITH OTHER THAN BASIC HAND TOOLS) | $28.96 | $16.35 |
| PAIN0106-017 | PAINTER(BRUSH; ROLLER; & LEAD BASE PAINT REMOVAL & ABATEMENT WITH BASIC HAND TOOLS SUCH AS SCRAPERS) | $28.36 | $16.35 |
| PLAS0633-047 | PLASTERER(KOOCHICHING) | $30.72 | $18.33 |
| PLAS0633-050 | PLASTERER(COOK, LAKE) | $38.24 | $23.23 |
| PLUM0011-024 | PLUMBER, PIPEFITTER, STEAMFITTER(COOK (A STRIP 20 MILES INLAND ALONG THE SHORES OF LAKE SUPERIOR), LAKE (A STRIP 20 MILES INLAND ALONG THE SHORES OF LAKE SUPERIOR)S) | $52.24 | $27.56 |
| PLUM0589-010 | PLUMBER, PIPEFITTER, STEAMFITTER(COOK (EXCEPT A STRIP 20 MILES INLAND ALONG THE SHORES OF LAKE SUPERIOR), KOOCHICHING, LAKE (EXCEPT A STRIP 20 MILES INLAND ALONG THE SHORES OF LAKE SUPERIOR)) | $48.55 | $29.33 |
| ROOF0096-049 | ROOFER(COOK, LAKE) | $45.12 | $23.15 |
| ROOF0096-050 | ROOFER(KOOCHICHING) | $40.39 | $20.53 |
| SHEE0010-085 | SHEET METAL WORKER(COOK, LAKE) | $33.36 | $24.25 |
| SHEE0010-086 | SHEET METAL WORKER(KOOCHICHING) | $29.85 | $24.33 |
| CARP0068-003 | SOFT FLOOR LAYER | $43.25 | $24.19 |
| SFMN0669-001 | SPRINKLER FITTER | $42.94 | $27.26 |
| BRMN0001-021 | TILE FINISHER | $25.23 | $22.05 |
| BRMN0001-017 | TILE LAYER(KOOCHICHING) | $32.54 | $30.66 |
| BRMN0003-003 | TILE LAYER(COOK, LAKE) | $32.54 | $30.66 |
| TEAM0346-001 | TRUCK DRIVERGROUP 1 BOOM TRUCK | $37.95 | $24.13 |
| TEAM0346-001 | TRUCK DRIVERGROUP 2 READY MIX, TRACTOR TRAILOR | $36.27 | $24.13 |
| TEAM0346-001 | TRUCK DRIVERGROUP 3 FORK LIFT, MECHANIC, TANDEM OR 3 AXLE TRUCK | $36.06 | $24.13 |
| TEAM0346-001 | TRUCK DRIVERGROUP 4 DUMPMAN, FARM TRACTOR, SINGLE OR 2 AXLE TRUCK | $35.79 | $24.13 |