Pulling the wage determination…
Revision 2 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 3 counties in Minnesota: Clay, Houston, Polk. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| CARP1382-030 | CARPENTER(HOUSTON) | $36.71 | $20.17 |
| CARP1934-004 | CARPENTER(CLAY, POLK) | $31.14 | $20.69 |
| ELEC0343-017 | ELECTRICIAN(HOUSTON) | $40.25 | $23.32 |
| ELEC1426-019 | ELECTRICIAN(CLAY, POLK) | $37.41 | $18.61 |
| IRON0512-039 | IRONWORKERSTRUCTURAL (CLAY, POLK) | $42.89 | $36.86 |
| IRON0512-040 | IRONWORKERSTRUCTURAL (HOUSTON) | $46.35 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $36.86 |
| SUMN2009-061 | LABORERLANDSCAPE | $11.50 | $0.00 |
| LABO1097-021 | LABORER GROUP 1(POLK (EXCLUDING THE CITY LIMITS OF EAST GRAND FORKS)) (Projects $760k and over) | $28.07 | $21.74 |
| LABO1097-021 | LABORER GROUP 1(POLK (EXCLUDING THE CITY LIMITS OF EAST GRAND FORKS)) (Projects under $760,000:) | $23.86 | $21.74 |
| LABO1097-021 | LABORER GROUP 2(POLK (EXCLUDING THE CITY LIMITS OF EAST GRAND FORKS)) (Projects under $760,000:) | $24.20 | $21.74 |
| LABO1097-021 | LABORER GROUP 2(POLK (EXCLUDING THE CITY LIMITS OF EAST GRAND FORKS)) (Projects $760k and over) | $28.47 | $21.74 |
| LABO0405-016 | LABORERS(2) PIPELAYER (HOUSTON) | $27.95 | $17.52 |
| LABO0405-016 | LABORERS(1) COMMON OR GENERAL (HOUSTON) | $27.25 | $17.52 |
| LABO0405-016 | LABORERS(3) MASON TENDER (BRICK, CEMENT/CONCRETE) (HOUSTON) | $25.42 | $17.52 |
| LABO0563-025 | LABORERSCOMMON OR GENERAL LABORER, MASON TENDER (BRICK,CEMENT/CONCRETE), PIPELAYER (CLAY (CITY OF MOORHEAD) COUNTY | $18.60 | $13.44 |
| LABO1097-006 | LABORERSCOMMON OR GENERAL LABORER, MASON TENDER (BRICK,CEMENT/CONCRETE), PIPELAYER (POLK (CITY OF EAST GRAND FORKS) COUNTY) | $20.87 | $17.39 |
| LABO0563-024 | LABORERS GROUP 1 COMMON OR GENERAL; MASON TENDER(BRICK, CEMENT/CONCRETE) (CLAY (EXCEPT CITY OF MOORHEAD)) PROJECTS OVER $950,000: $1.75 ADDITIONAL PER HOUR | $20.21 | $14.97 |
| LABO0563-024 | LABORERS GROUP 2 PIPELAYER(CLAY (EXCEPT CITY OF MOORHEAD)) PROJECTS OVER $950,000: $1.75 ADDITIONAL PER HOUR | $20.96 | $14.97 |
| ENGI0049-062 | OPERATORPOWER EQUIPMENT GROUP 2 GRADER/BLADE (CLAY, POLK) | $32.98 | $15.85 |
| ENGI0049-062 | OPERATORPOWER EQUIPMENT GROUP 8 OILER. (CLAY, POLK) | $26.80 | $15.85 |
| ENGI0049-062 | OPERATORPOWER EQUIPMENT GROUP 5 BULLDOZER, CURB MACHINE, FORKLIFT, LOADER OVER 1 CU YD, MECHANIC, ROLLER, SCRAPER, TRACTOR OVER D2. (CLAY, POLK) | $31.17 | $15.85 |
| ENGI0049-062 | OPERATORPOWER EQUIPMENT GROUP 4 BACKHOE (CLAY, POLK) | $31.33 | $15.85 |
| ENGI0049-062 | OPERATORPOWER EQUIPMENT GROUP 6 LOADER UP TO 1 CU YD, TRACTOR D2 OR SIMILAR SIZE. (CLAY, POLK) | $29.75 | $15.85 |
| ENGI0049-063 | OPERATORPOWER EQUIPMENT GROUP 6 LOADER UP TO 1 CU YD, TRACTOR D2 OR SIMILAR SIZE. (HOUSTON) | $31.42 | $15.85 |
| ENGI0049-063 | OPERATORPOWER EQUIPMENT GROUP 5 BULLDOZER, CURB MACHINE, FORKLIFT, LOADER OVER 1 CU YD, MECHANIC, ROLLER, SCRAPER, TRACTOR OVER D2.(HOUSTON) | $32.93 | $15.85 |
| ENGI0049-063 | OPERATORPOWER EQUIPMENT GROUP 4 BACKHOE (HOUSTON) | $33.10 | $15.85 |
| ENGI0049-063 | OPERATORPOWER EQUIPMENT GROUP 2 GRADER/BLADE (HOUSTON) | $34.85 | $15.85 |
| ENGI0049-063 | OPERATORPOWER EQUIPMENT GROUP 8OILER. (HOUSTON) | $28.29 | $15.85 |
| PAIN0681-024 | PAINTERSPRAY (HOUSTON) | $19.00 | $3.00 |
| PAIN0884-027 | PAINTERSPRAY (CLAY, POLK) | $22.61 | $8.66 |
| PLUM0006-012 | PLUMBER(HOUSTON) | $47.50 | $30.33 |
| PLUM0011-026 | PLUMBER(CLAY, POLK) | $48.74 | $21.34 |
| ROOF0096-059 | ROOFER(CLAY, POLK) | $36.01 | $16.72 |
| ROOF0096-060 | ROOFER(HOUSTON) | $32.71 | $16.99 |
| SHEE0010-089 | SHEET METAL WORKER(POLK) | $35.37 | $21.12 |
| SHEE0010-090 | SHEET METAL WORKER(CLAY) | $35.76 | $23.17 |
| SHEE0010-091 | SHEET METAL WORKER(HOUSTON) | $40.03 | $28.95 |