Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 2 counties in Minnesota: Benton, Stearns. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| CARP0322-006 | CARPENTER(WOODFRAME ONLY) | $43.86 | $17.70 |
| CARP0930-003 | CARPENTER(EXCLUDES WOODFRAME) | $36.71 | $20.17 |
| ELEC0292-020 | ELECTRICIAN(BENTON EAST OF HWY 25 TO HWY 10 AND AN IMAGINARY LINE STRAIGHT WEST TO THE MISSISSIPPI RIVER & STEARNS) | $52.00 | $32.80 |
| ELEC0292-020 | ELECTRICIAN, ELECTRICAL CONTRACTS $5 MILLION AND OVER(BENTON WEST OF HWY 25 TO HWY 10 AND AN IMAGINARY LINE STRAIGHT WEST TO THE MISSISSIPPI RIVER) | $50.45 | $31.14 |
| ELEC0292-020 | ELECTRICIAN, ELECTRICAL CONTRACTS UNDER $5 MILLION(BENTON WEST OF HWY 25 TO HWY 10 AND AN IMAGINARY LINE STRAIGHT WEST TO THE MISSISSIPPI RIVER) | $50.00 | $30.86 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| IRON0512-001 | IRONWORKERSTRUCTURAL | $46.35 | $36.86 |
| SUMN2009-058 | LABORERLANDSCAPE | $11.50 | $0.00 |
| SUMN2009-058 | LABORERCOMMON OR GENERAL | $13.26 | $2.81 |
| LABO0563-023 | LABORERSGROUP 1 MASON TENDER (BRICK, CEMENT/CONCRETE) PROJECTS OVER $950,000: $1.75 ADDITIONAL PER HOUR | $21.81 | $14.97 |
| LABO0563-023 | LABORERSGROUP 2 PIPELAYER PROJECTS OVER $950,000: $1.75 ADDITIONAL PER HOUR | $22.56 | $14.97 |
| ENGI0049-060 | OPERATORPOWER EQUIPMENT GROUP 4 BACKHOE | $33.10 | $15.95 |
| ENGI0049-060 | OPERATORPOWER EQUIPMENT GROUP 6 LOADER UP TO 1 CU YD, TRACTOR D2 OR SIMILAR SIZE | $31.42 | $15.95 |
| ENGI0049-060 | OPERATORPOWER EQUIPMENT GROUP 8 OILER | $28.29 | $15.95 |
| ENGI0049-060 | OPERATORPOWER EQUIPMENT GROUP 2 GRADER/BLADE | $34.85 | $15.95 |
| ENGI0049-060 | OPERATORPOWER EQUIPMENT GROUP 5 BULLDOZER, CURB MACHINE, FORKLIFT, LOADER OVER 1 CU YD, MECHANIC, ROLLER, SCRAPER, TRACTOR OVER D2 | $32.93 | $15.95 |
| PAIN0884-026 | PAINTERSPRAY. PROJECTS UNDER $8,000: RECEIVE 80% OF BASIC HOURLY RATE | $24.91 | $13.31 |
| PLUM0015-019 | PLUMBER. FOOTNOTEPAID HOLIDAY: LABOR DAY | $53.16 | $32.21 |
| ROOF0096-052 | ROOFER | $42.93 | $22.87 |
| SHEE0010-014 | SHEET METAL WORKER | $35.60 | $25.14 |