Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 1 county in Minnesota: Hennepin. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| CARP0322-019 | CARPENTER | $40.63 | $28.42 |
| ELEC0292-021 | ELECTRICIAN | $59.00 | $35.79 |
| IRON0512-001 | IRONWORKERSTRUCTURAL | $46.35 | $36.86 |
| SUMN2009-056 | LABORERLANDSCAPE | $11.50 | $0.00 |
| LABO0563-044 | LABORER GROUP 1 COMMON OR GENERAL LABORER, ASPHALT RAKER, MASON TENDER(BRICK, CEMENT/CONCRETE), PLASTER TENDER, TOP PERSON | $28.46 | $15.82 |
| LABO0563-044 | LABORER GROUP 2 BOTTOM PERSON, MASON TENDER(BRICK, CEMENT/CONCRETE), PIPELAYER | $28.96 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $15.82 |
| ENGI0049-059 | OPERATORPOWER EQUIPMENT GROUP 6 LOADER UP TO 1 CU YD, TRACTOR D2 OR SIMILAR SIZE | $31.42 | $15.95 |
| ENGI0049-059 | OPERATORPOWER EQUIPMENT GROUP 7 SELF PROPELLED VIBRATING PACKER | $30.30 | $15.95 |
| ENGI0049-059 | OPERATORPOWER EQUIPMENT GROUP 8 OILER | $28.29 | $15.95 |
| ENGI0049-059 | OPERATORPOWER EQUIPMENT GROUP 3 DRAGLINE | $33.44 | $15.95 |
| ENGI0049-059 | OPERATORPOWER EQUIPMENT GROUP 2 GRADER/BLADE | $34.85 | $15.95 |
| ENGI0049-059 | OPERATORPOWER EQUIPMENT GROUP 5 BULLDOZER, CURB MACHINE, FORKLIFT, LOADER OVER 1 CU YD, MECHANIC, ROLLER, SCRAPER, TRACTOR OVER D2 | $32.93 | $15.95 |
| ENGI0049-059 | OPERATORPOWER EQUIPMENT GROUP 4 BACKHOE | $33.10 | $15.95 |
| PAIN0386-020 | PAINTER(SPRAY) | $31.45 | $17.85 |
| PLUM0015-001 | PLUMBER FOOTNOTEPAID HOLIDAY: LABOR DAY | $59.54 | $33.26 |
| ROOF0096-054 | ROOFER FOOTNOTEPAID HOLIDAY: LABOR DAY | $48.32 | $25.54 |
| SHEE0010-004 | SHEET METAL WORKER FOOTNOTEPAID HOLIDAY - LABOR DAY | $45.01 | $26.53 |