Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 1 county in Minnesota: Big Stone. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUMN1990-011 | BRICKLAYER | $13.87 | $0.00 |
| SUMN1990-011 | CARPENTER | $9.00 | $0.00 |
| SUMN1990-011 | CEMENT MASON/CONCRETE FINISHER | $7.37 | $0.00 |
| SUMN1990-011 | ELECTRICIAN | $9.08 | $2.09 |
| SUMN1990-011 | LABORER | $7.25 | $0.00 |
| SUMN1990-011 | PAINTERBRUSH ONLY | $7.25 | $0.00 |
| SUMN1990-011 | PLUMBER | $11.59 | $0.00 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| SUMN1990-011 | POWER EQUIPMENT OPERATOR(BACKHOE) | $8.08 | $0.00 |
| SUMN1990-011 | POWER EQUIPMENT OPERATORCRANE | $8.75 | $0.00 |
| SUMN1990-011 | POWER EQUIPMENT OPERATOR(FRONT END LOADER) | $9.02 | $0.00 |
| SUMN1990-011 | ROOFER | $9.78 | $0.00 |
| SUMN1990-011 | SHEET METAL WORKER | $11.94 | $2.48 |