Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 15 counties in Minnesota: Blue Earth, Brown, Faribault, Fillmore, Freeborn, Goodhue, Le Sueur, Martin, Mower, Nicollet, Rice, Steele and 3 more. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUMN1990-003 | BRICKLAYER | $11.00 | $0.00 |
| SUMN1990-003 | CARPENTER | $12.18 | $1.10 |
| SUMN1990-003 | CEMENT MASON/CONCRETE FINISHER | $11.00 | $0.00 |
| SUMN1990-003 | DRYWALL TAPER | $10.69 | $0.00 |
| SUMN1990-003 | ELECTRICIAN | $14.05 | $4.23 |
| SUMN1990-003 | LABORERS(COMMON) | $7.86 | $0.00 |
| SUMN1990-003 | LABORERSMASON TENDER | $8.50 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $0.00 |
| SUMN1990-003 | PAINTER | $14.00 | $2.44 |
| SUMN1990-003 | PIPEFITTER(DOES NOT INCLUDE HVAC WORK) | $14.58 | $4.67 |
| SUMN1990-003 | PLUMBER(INCLUDES HVAC WORK) | $13.26 | $2.44 |
| SUMN1990-003 | POWER EQUIPMENT OPERATOR(BACKHOE) | $12.68 | $0.00 |
| SUMN1990-003 | POWER EQUIPMENT OPERATOR(BULLDOZER) | $12.96 | $0.00 |
| SUMN1990-003 | SHEET METAL WORKER | $10.14 | $1.82 |
| SUMN1990-003 | TRUCK DRIVER | $8.80 | $0.00 |