Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Michigan: Mecosta. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUMI2011-062 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $19.82 | $7.31 |
| BOIL0169-002 | BOILERMAKER | $43.50 | $37.64 |
| BRMI0009-012 | BRICKLAYER FOOTNOTEPAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $35.83 | $22.33 |
| CARP0100-007 | CARPENTER(ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION) | $31.50 | $21.15 |
| SUMI2011-062 | CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING,DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION, AND SOFT FLOOR LAYING-CARPET | $19.26 | $5.93 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| PLAS0016-041 |
| CEMENT MASON/CONCRETE FINISHER |
| $22.02 |
| $12.38 |
| ELEC0275-003 | ELECTRICIAN(EXCLUDES LOW VOLTAGE WIRING) | $35.68 | $23.36 |
| SUMI2011-062 | FLOOR LAYERCARPET | $19.59 | $7.57 |
| SUMI2011-062 | GLAZIER | $16.95 | $4.74 |
| IRON0025-005 | IRONWORKERREINFORCING | $36.55 | $29.51 |
| IRON0025-005 | IRONWORKERSTRUCTURAL | $36.55 | $29.51 |
| IRON0025-009 | IRONWORKERSTRUCTURAL (METAL BUILDING ERECTION ONLY) | $30.02 | $27.43 |
| LABO0355-018 | LABORERMASON TENDER - BRICK/CEMENT/CONCRETE EXCLUDES OPEN CUT CONSTRUCTION | $30.72 | $12.95 |
| LABO0355-018 | LABORERCOMMON OR GENERAL; SANDBLASTER EXCLUDES OPEN CUT CONSTRUCTION | $23.34 | $11.60 |
| SUMI2011-062 | LABORERLANDSCAPE & IRRIGATION | $12.84 | $0.00 |
| CARP1102-005 | MILLWRIGHT | $40.04 | $26.47 |
| SUMI2011-062 | OPERATORROLLER | $28.02 | $7.07 |
| SUMI2011-062 | OPERATORBULLDOZER | $22.34 | $1.22 |
| SUMI2011-062 | OPERATORTRACTOR | $19.60 | $7.31 |
| SUMI2011-062 | OPERATORGRADER/BLADE | $24.04 | $6.03 |
| PAIN0845-014 | PAINTER(DRYWALL FINISHING/TAPING ONLY) | $27.32 | $16.72 |
| PAIN0845-014 | PAINTERBRUSH, ROLLER, AND SPRAY ONLY | $27.07 | $16.56 |
| PLUM0174-006 | PIPEFITTER(EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $37.89 | $23.67 |
| PLUM0174-006 | PIPEFITTER(HVAC PIPE INSTALLATION ONLY) | $37.09 | $22.52 |
| PLAS0016-041 | PLASTERER | $21.18 | $12.43 |
| PLUM0174-006 | PLUMBER(EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $37.89 | $23.67 |
| ENGI0324-028 | POWER EQUIPMENT OPERATORGROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 |
| ENGI0324-028 | POWER EQUIPMENT OPERATORGROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 |
| ENGI0324-028 | POWER EQUIPMENT OPERATORGROUP 3 BACKHOE/EXCAVATOR; CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 |
| ENGI0324-028 | POWER EQUIPMENT OPERATORGROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 |
| ENGI0324-028 | POWER EQUIPMENT OPERATORGROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 |
| ENGI0324-028 | POWER EQUIPMENT OPERATORGROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 |
| SUMI2011-062 | ROOFER | $15.73 | $7.41 |
| SHEE0007-005 | SHEET METAL WORKER(HVAC DUCT & SYSTEM INSTALLATION) | $35.41 | $15.86 |
| SHEE0007-005 | SHEET METAL WORKER(EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) | $35.41 | $15.86 |
| SFMI0669-003 | SPRINKLER FITTER(FIRE SPRINKLERS) | $41.34 | $27.39 |
| BRMI0009-012 | TILE SETTER FOOTNOTEPAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $35.83 | $22.33 |
| SUMI2011-062 | TRUCK DRIVERFLATBED TRUCK | $16.80 | $3.97 |
| SUMI2011-062 | TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $15.65 | $3.12 |