Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Michigan: Manistee. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0047-005 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 |
| BOIL0169-002 | BOILERMAKER | $43.50 | $37.64 |
| SUMI2011-059 | BRICKLAYER | $24.89 | $3.10 |
| CARP0202-002 | CARPENTER(DRYWALL HANGER AND FORM WORK) | $30.83 | $21.09 |
| CARP0202-005 | CARPENTER(EXCLUDE DRYWALL HANGER AND FORM WORK) | $30.83 | $21.09 |
| SUMI2011-059 | CEMENT MASON/CONCRETE FINISHER | $17.30 | $4.69 |
| ELEC0498-013 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| ELECTRICIAN |
| $36.62 |
| $23.05 |
| SUMI2011-059 | GLAZIER | $17.19 | $3.83 |
| IRON0025-005 | IRONWORKERSTRUCTURAL | $36.55 | $29.51 |
| IRON0025-005 | IRONWORKERREINFORCING | $36.55 | $29.51 |
| LABO0355-018 | LABORERCOMMON OR GENERAL; SANDBLASTER EXCLUDES OPEN CUT CONSTRUCTION | $23.34 | $11.60 |
| LABO0355-018 | LABORERMASON TENDER - BRICK/CEMENT/CONCRETE EXCLUDES OPEN CUT CONSTRUCTION | $30.72 | $12.95 |
| SUMI2011-059 | LABORERLANDSCAPE & IRRIGATION | $11.04 | $4.39 |
| CARP1102-005 | MILLWRIGHT | $40.04 | $26.47 |
| SUMI2011-059 | OPERATORROLLER | $27.47 | $8.86 |
| SUMI2011-059 | OPERATORLOADER | $24.04 | $6.03 |
| SUMI2011-059 | OPERATORGRADER/BLADE | $24.04 | $6.03 |
| SUMI2011-059 | OPERATORBULLDOZER | $22.46 | $7.29 |
| SUMI2011-059 | OPERATORBACKHOE/EXCAVATOR | $24.04 | $6.03 |
| SUMI2011-059 | OPERATORTRACTOR | $19.60 | $7.31 |
| SUMI2011-059 | PAINTERBRUSH, ROLLER AND SPRAY | $16.20 | $2.19 |
| PLUM0174-007 | PIPEFITTER(HVAC PIPE INSTALLATION ONLY) | $37.09 | $22.52 |
| PLUM0174-007 | PIPEFITTER(EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $37.89 | $23.67 |
| PLUM0174-007 | PLUMBER(EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $37.89 | $23.67 |
| PLUM0174-007 | PLUMBER(HVAC SYSTEM INSTALLATION ONLY) | $35.26 | $22.52 |
| ENGI0324-029 | POWER EQUIPMENT OPERATORGROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 |
| ENGI0324-029 | POWER EQUIPMENT OPERATORGROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 |
| ENGI0324-029 | POWER EQUIPMENT OPERATORGROUP 3 CRANE; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 |
| ENGI0324-029 | POWER EQUIPMENT OPERATORGROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 |
| ENGI0324-029 | POWER EQUIPMENT OPERATORGROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 |
| ENGI0324-029 | POWER EQUIPMENT OPERATORGROUP 4 FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 |
| SUMI2011-059 | ROOFER | $13.64 | $4.58 |
| SHEE0007-003 | SHEET METAL WORKER(HVAC DUCT INSTALLATION ONLY) | $31.05 | $25.07 |
| SHEE0007-003 | SHEET METAL WORKER(EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) | $31.05 | $25.07 |
| SFMI0669-003 | SPRINKLER FITTER(FIRE SPRINKLERS) | $41.34 | $27.39 |
| BRMI0009-026 | TILE SETTER | $35.83 | $22.18 |
| SUMI2011-059 | TRUCK DRIVERFLATBED TRUCK | $17.44 | $4.51 |
| SUMI2011-059 | TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $16.56 | $3.50 |