Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Michigan: Chippewa. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0047-005 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 |
| BOIL0169-002 | BOILERMAKER | $43.50 | $37.64 |
| BRMI0006-001 | BRICKLAYER | $32.19 | $24.65 |
| CARP1510-006 | CARPENTER(INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, FORM WORK, AND SOFT FLOOR LAYER - CARPET) | $34.01 | $23.14 |
| PLAS0016-037 | CEMENT MASON/CONCRETE FINISHER | $20.17 | $10.13 |
| SUMI2011-038 | GLAZIER | $17.50 | $2.27 |
| IRON0008-008 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| IRONWORKER, REINFORCING AND STRUCTURAL(CONTRACTS $10,000,000 OR GREATER) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY |
| $35.20 |
| $32.97 |
| IRON0008-008 | IRONWORKER, REINFORCING AND STRUCTURAL(CONTRACTS LESS THAN $10,000,000) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | $35.20 | $32.97 |
| LABO1329-005 | LABORER(COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND SANDBLASTER) | $28.18 | $13.45 |
| SUMI2011-038 | LABORERLANDSCAPE & IRRIGATION | $14.95 | $0.00 |
| CARP1510-005 | MILLWRIGHT | $41.00 | $23.43 |
| SUMI2011-038 | OPERATORTRACTOR | $19.60 | $7.31 |
| SUMI2011-038 | OPERATORGRADER/BLADE | $24.04 | $6.03 |
| SUMI2011-038 | OPERATORCRANE | $21.73 | $11.35 |
| PAIN1011-001 | PAINTER(INSULATOR FOAM ONLY) | $28.73 | $15.92 |
| PAIN1011-004 | PAINTER(BRUSH AND SPRAY ONLY) | $28.73 | $15.92 |
| SUMI2011-038 | PAINTERROLLER | $16.58 | $2.84 |
| PLUM0111-002 | PIPEFITTER(HVAC PIPE INSTALLATION ONLY) | $34.59 | $27.53 |
| PLUM0111-002 | PIPEFITTER(EXCLUDES HVAC PIPE & SYSTEM INSTALLATION) | $45.44 | $28.43 |
| PLUM0111-002 | PLUMBER(EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $34.59 | $27.53 |
| ENGI0324-032 | POWER EQUIPMENT OPERATORGROUP 1 BACKHOE, BULLDOZER, FRONT END LOADER, EXCAVATOR, PAVER, ROLLER, AND SCRAPER (SELF-PROPELLED AND TRACTOR DRAWN) | $40.51 | $25.00 |
| ENGI0324-032 | POWER EQUIPMENT OPERATORGROUP 3 OILER | $35.86 | $12.50 |
| ENGI0324-032 | POWER EQUIPMENT OPERATORGROUP 2 FORK TRUCK | $37.26 | $25.00 |
| ROOF0149-014 | ROOFER | $26.50 | $15.95 |
| SHEE0007-006 | SHEET METAL WORKER(HVAC DUCT & SYSTEM INSTALLATION) | $27.24 | $29.85 |
| SHEE0007-006 | SHEET METAL WORKER(EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) | $32.74 | $29.85 |
| BRMI0006-001 | TILE SETTER | $32.19 | $24.65 |
| SUMI2011-038 | TRUCK DRIVERFLATBED TRUCK | $17.44 | $4.51 |