Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Michigan: Allegan. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUMI2011-029 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $19.82 | $7.31 |
| BOIL0169-002 | BOILERMAKER | $43.50 | $37.64 |
| BRMI0009-013 | BRICKLAYER(ALLEGAN COUNTY (TOWNSHIPS OF BRADLEY, DORR, GREEN LAKE, & HOPKINS)) FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $35.21 | $24.34 |
| BRMI0009-028 | BRICKLAYER(TOWNSHIPS OF ALLEGAN, CASCO, CHESHIRE, CLYDE, GRANGES, GUN PLAIN, LEE, MARTIN, OTSEGO, TROWBRIDGE, VALLEY & WATSON) | $35.21 | $24.34 |
| CARP0100-001 | CARPENTER(EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION, AND SOFT FLOOR LAYER-CARPET) | $31.50 | $21.15 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| CARP0100-007 | CARPENTER(ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION) | $31.50 | $21.15 |
| SUMI2011-029 | CARPENTER(FLOOR LAYING-CARPET ONLY) | $19.59 | $7.57 |
| SUMI2011-029 | CEMENT MASON/CONCRETE FINISHER | $15.31 | $4.47 |
| ELEC0131-002 | ELECTRICIANEXCLUDES LOW VOLTAGE WIRING (TOWNSHIPS OF ALLEGAN, CASCO, CHESHIRE, CLYDE, GANGES, GUN PLAIN, HEATH, HOPKINS, LEE, MANLIUS, MARTIN, MONTEREY, OTSEGO, SAUGATUCK, TROWBRIDGE, VALLEY, WATSON & WAYLAND) | $42.78 | $21.84 |
| ELEC0275-005 | ELECTRICIANEXCLUDES LOW VOLTAGE WIRING (TOWNSHIPS OF DORR, FILLMORE, LAKETON, LEIGHTON, OVERISEL, & SALEM) | $35.68 | $23.36 |
| SUMI2011-029 | GLAZIER | $16.95 | $4.74 |
| IRON0025-005 | IRONWORKERSTRUCTURAL | $36.55 | $29.51 |
| IRON0025-005 | IRONWORKERREINFORCING | $36.55 | $29.51 |
| IRON0025-009 | IRONWORKERSTRUCTURAL (METAL BUILDING ERECTION ONLY) | $30.02 | $27.43 |
| LABO0355-016 | LABORERMASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE | $30.72 | $12.95 |
| LABO0355-016 | LABORERCOMMON OR GENERAL; SANDBLASTER | $27.21 | $13.45 |
| SUMI2011-029 | LABORERLANDSCAPE & IRRIGATION | $12.84 | $0.00 |
| CARP1102-005 | MILLWRIGHT | $40.04 | $26.47 |
| SUMI2011-029 | OPERATORGRADER/BLADE | $24.04 | $6.03 |
| SUMI2011-029 | OPERATORBULLDOZER | $22.34 | $1.22 |
| SUMI2011-029 | OPERATORFORKLIFT | $15.31 | $4.47 |
| SUMI2011-029 | OPERATORROLLER | $28.02 | $7.07 |
| SUMI2011-029 | OPERATORTRACTOR | $19.60 | $7.31 |
| PLUM0174-001 | PIPEFITTERHVAC PIPE INSTALLATION ONLY (TOWNSHIPS OF DORR, FILLMORE, LAKETOWN, LEIGHTON, OVERISEL & SALEM) | $47.40 | $23.35 |
| PLUM0174-001 | PIPEFITTEREXCLUDING HVAC PIPE & SYSTEM INSTALLATION (TOWNSHIPS OF DORR, FILLMORE, LAKETOWN, LEIGHTON, OVERISEL & SALEM) | $47.40 | $23.35 |
| PLUM0357-002 | PIPEFITTEREXCLUDES HVAC PIPE & SYSTEM INSTALLATION (EXCLUDES TOWNSHIPS OF DORR, FILLMORE, LAKETOWN, LEIGHTON, OVERISEL & SALEM) | $32.50 | $24.97 |
| PLUM0357-002 | PIPEFITTERHVAC PIPE INSTALLATION ONLY (EXCLUDES TOWNSHIPS OF DORR, FILLMORE, LAKETOWN, LEIGHTON, OVERISEL & SALEM) | $32.50 | $24.97 |
| PLAS0016-043 | PLASTERER | $21.18 | $12.43 |
| PLUM0174-001 | PLUMBEREXCLUDING HVAC PIPE & SYSTEM INSTALLATION (TOWNSHIPS OF DORR, FILLMORE, LAKETOWN, LEIGHTON, OVERISEL & SALEM) | $47.40 | $23.35 |
| PLUM0357-002 | PLUMBEREXCLUDING HVAC PIPE & SYSTEM INSTALLATION (EXCLUDES TOWNSHIPS OF DORR, FILLMORE, LAKETOWN, LEIGHTON, OVERISEL & SALEM) | $32.50 | $24.97 |
| ENGI0324-027 | POWER EQUIPMENT OPERATORGROUP 5 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 |
| ENGI0324-027 | POWER EQUIPMENT OPERATORGROUP 4 BOBCAT/SKID LOADER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 |
| ENGI0324-027 | POWER EQUIPMENT OPERATORGROUP 3 BACKHOE/EXCAVATOR; CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 |
| ENGI0324-027 | POWER EQUIPMENT OPERATORGROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 |
| ENGI0324-027 | POWER EQUIPMENT OPERATORGROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 |
| SUMI2011-029 | ROOFER | $15.73 | $7.41 |
| SHEE0007-001 | SHEET METAL WORKER(HVAC DUCT & SYSTEM INSTALLATION) | $42.74 | $21.53 |
| SHEE0007-001 | SHEET METAL WORKER(EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) | $42.74 | $21.53 |
| SFMI0669-003 | SPRINKLER FITTER(FIRE SPRINKLERS) | $41.34 | $27.39 |
| BRMI0009-013 | TILE SETTER(ALLEGAN COUNTY (TOWNSHIPS OF BRADLEY, DORR, GREEN LAKE, & HOPKINS)) FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $32.20 | $23.46 |
| BRMI0009-028 | TILE SETTER(TOWNSHIPS OF ALLEGAN, CASCO, CHESHIRE, CLYDE, GRANGES, GUN PLAIN, LEE, MARTIN, OTSEGO, TROWBRIDGE, VALLEY & WATSON) | $32.20 | $23.46 |
| SUMI2011-029 | TRUCK DRIVERFLATBED TRUCK | $16.80 | $3.97 |
| SUMI2011-029 | TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $15.65 | $3.12 |