Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Michigan: Van Buren. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0047-002 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 |
| BOIL0169-001 | BOILERMAKER | $43.50 | $36.74 |
| BRMI0009-031 | BRICKLAYER | $35.21 | $24.26 |
| CARP0525-013 | CARPENTER(INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION & SCAFFOLD BUILDER) | $28.29 | $21.42 |
| PLAS0016-006 | CEMENT MASON/CONCRETE FINISHER(TWPS OF SOUTH HAVEN, COVERT, GENEVA, BANGOR, HARTFORD, KEELER, HAMILTON, LAWRENCE, ARLINGTON & COLUMBIA) | $24.63 | $12.88 |
| PLAS0016-006 | CEMENT MASON/CONCRETE FINISHER(TWPS OF BLOOMINGDALE, WAVERLY, PAW PAW, DECATUR, PORTER, ANTWERP, ALMENA & PINEGROVE) |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $22.31 |
| $12.83 |
| ELEC0131-001 | ELECTRICIAN(EXCLUDES LOW VOLTAGE WIRING) | $42.78 | $21.84 |
| IRON0025-005 | IRONWORKERSTRUCTURAL | $36.55 | $29.51 |
| IRON0025-005 | IRONWORKERREINFORCING | $36.55 | $29.51 |
| SUMI2011-024 | IRONWORKER, ORNAMENTAL | $18.48 | $7.93 |
| LABO0355-024 | LABORERCOMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; SANDBLASTER | $27.21 | $13.45 |
| SUMI2011-024 | LABORERMASON TENDER - BRICK | $20.29 | $7.22 |
| SUMI2011-024 | LABORERLANDSCAPE & IRRIGATION | $10.38 | $0.50 |
| CARP1102-001 | MILLWRIGHT | $40.04 | $26.47 |
| ENGI0324-015 | OPERATORPOWER EQUIPMENT: GROUP 7 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 |
| ENGI0324-015 | OPERATORPOWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 |
| ENGI0324-015 | OPERATORPOWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 |
| ENGI0324-015 | OPERATORPOWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR/TRACKHOE; CONCRETE PUMP; CRANE; GRADER/BLADE; HIGHLIFT; HOIST; LOADER; ROLLER; SCRAPER; STIFF LEG DERRICK; TRENCHER; STIFF LEG DERRICK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 |
| ENGI0324-015 | OPERATORPOWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 |
| ENGI0324-015 | OPERATORPOWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 |
| ENGI0324-015 | OPERATORPOWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 |
| SUMI2011-024 | OPERATORBULLDOZER | $19.68 | $6.64 |
| SUMI2011-024 | OPERATORTRACTOR | $19.10 | $8.48 |
| PAIN0845-013 | PAINTERBRUSH AND ROLLER | $27.07 | $16.46 |
| PAIN0845-013 | PAINTERDRYWALL FINISHING/TAPING | $27.32 | $16.72 |
| PAIN0845-013 | PAINTERSPRAY | $27.07 | $16.56 |
| PLUM0357-007 | PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION | $32.50 | $24.97 |
| PLUM0357-007 | PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION | $32.50 | $24.97 |
| ROOF0070-002 | ROOFER | $33.98 | $18.51 |
| SHEE0007-010 | SHEET METAL WORKER(HVAC DUCT INSTALLATION ONLY) | $42.74 | $21.53 |
| SUMI2011-024 | SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $24.56 | $7.20 |
| SFMI0669-001 | SPRINKLER FITTER(FIRE SPRINKLERS) | $41.34 | $27.39 |
| BRMI0009-031 | TILE FINISHER | $26.24 | $21.13 |
| BRMI0009-031 | TILE SETTER | $27.35 | $22.20 |
| SUMI2011-024 | TRUCK DRIVERLOWBOY TRUCK | $14.50 | $0.44 |
| SUMI2011-024 | TRUCK DRIVERTRACTOR HAUL TRUCK | $13.57 | $1.18 |
| SUMI2011-024 | TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $17.26 | $11.42 |