Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Michigan: Ottawa. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0047-002 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 |
| BOIL0169-001 | BOILERMAKER | $43.50 | $36.74 |
| SUMI2011-021 | BRICKLAYER | $21.73 | $5.37 |
| CARP0100-002 | CARPENTER(INCLUDING FORM WORK; EXCLUDING DRYWALL HANGING) | $31.50 | $21.15 |
| SUMI2011-021 | CARPENTER(DRYWALL HANGING ONLY) | $17.26 | $2.69 |
| SUMI2011-021 | CEMENT MASON/CONCRETE FINISHER | $17.43 | $4.42 |
| SUMI2011-021 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| ELECTRICIAN |
| $20.81 |
| $5.01 |
| SUMI2011-021 | HVAC MECHANIC(INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT) | $18.92 | $4.71 |
| IRON0025-005 | IRONWORKERREINFORCING | $36.55 | $29.51 |
| IRON0025-005 | IRONWORKERSTRUCTURAL | $36.55 | $29.51 |
| SUMI2011-021 | IRONWORKER, ORNAMENTAL | $18.48 | $7.93 |
| LABO0355-026 | LABORERCOMMON OR GENERAL; GRADE CHECKER; SANDBLASTER | $28.56 | $12.95 |
| SUMI2011-021 | LABORERPIPELAYER | $18.32 | $3.28 |
| SUMI2011-021 | LABORERMASON TENDER - BRICK | $17.61 | $4.13 |
| SUMI2011-021 | LABORERLANDSCAPE & IRRIGATION | $8.93 | $1.62 |
| SUMI2011-021 | LABORERMASON TENDER - CEMENT/CONCRETE | $14.82 | $3.59 |
| CARP1102-001 | MILLWRIGHT | $40.04 | $26.47 |
| ENGI0324-014 | OPERATORPOWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 |
| ENGI0324-014 | OPERATORPOWER EQUIPMENT: GROUP 4 BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 |
| ENGI0324-014 | OPERATORPOWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR/TRACKHOE; CONCRETE PUMP; CRANE; GRADER/BLADE; HIGHLIFT; HOIST; ROLLER; SCRAPER; STIFF LEG DERRICK; TRENCHER; STIFF LEG DERRICK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 |
| ENGI0324-014 | OPERATORPOWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 |
| ENGI0324-014 | OPERATORPOWER EQUIPMENT: GROUP 7 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 |
| ENGI0324-014 | OPERATORPOWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 |
| ENGI0324-014 | OPERATORPOWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 |
| SUMI2011-021 | OPERATORTRACTOR | $15.72 | $1.92 |
| SUMI2011-021 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $14.96 | $4.01 |
| SUMI2011-021 | OPERATORBULLDOZER | $17.56 | $4.95 |
| SUMI2011-021 | OPERATORLOADER | $16.38 | $3.44 |
| PAIN0845-006 | PAINTERBRUSH AND SPRAY | $28.75 | $18.68 |
| SUMI2011-021 | PAINTERROLLER | $17.28 | $3.43 |
| PLUM0174-002 | PIPEFITTER(INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION) | $47.40 | $23.35 |
| PLUM0174-002 | PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION | $47.40 | $23.35 |
| ROOF0070-004 | ROOFER | $26.60 | $16.75 |
| SUMI2011-021 | SHEET METAL WORKER(HVAC DUCT INSTALLATION ONLY) | $20.96 | $7.35 |
| SHEE0007-014 | SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $35.41 | $15.86 |
| SUMI2011-021 | SPRINKLER FITTER(FIRE SPRINKLERS) | $18.07 | $4.93 |
| BRMI0009-008 | TILE FINISHER | $27.94 | $21.15 |
| BRMI0009-008 | TILE SETTER | $32.20 | $23.46 |
| SUMI2011-021 | TRUCK DRIVERDUMP TRUCK | $19.82 | $2.19 |
| SUMI2011-021 | TRUCK DRIVERTRACTOR HAUL TRUCK | $13.57 | $1.18 |