Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Michigan: Newaygo. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0047-002 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 |
| BOIL0169-001 | BOILERMAKER | $43.50 | $36.74 |
| SUMI2011-019 | BRICKLAYER | $21.45 | $5.00 |
| SUMI2011-019 | CARPENTER(ACOUSTICAL CEILING INSTALLATION ONLY) | $18.49 | $2.69 |
| SUMI2011-019 | CARPENTER(FORM WORK ONLY) | $18.62 | $6.42 |
| SUMI2011-019 | CARPENTER(DRYWALL HANGING ONLY) | $17.26 | $2.69 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| CARP0100-003 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK |
| $31.50 |
| $21.50 |
| SUMI2011-019 | CEMENT MASON/CONCRETE FINISHER | $17.16 | $4.25 |
| SUMI2011-019 | DRYWALL FINISHER/TAPER | $15.91 | $2.92 |
| SUMI2011-019 | ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING | $21.34 | $6.81 |
| SUMI2011-019 | GLAZIER | $15.29 | $2.68 |
| SUMI2011-019 | HVAC MECHANIC(INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT) | $16.75 | $2.75 |
| SUMI2011-019 | IRONWORKER, ORNAMENTAL | $18.48 | $7.93 |
| IRON0025-013 | IRONWORKER, REINFORCING | $36.55 | $29.51 |
| SUMI2011-019 | IRONWORKER, STRUCTURAL | $18.13 | $4.88 |
| LABO0355-026 | LABORERCOMMON OR GENERAL; GRADE CHECKER; SANDBLASTER | $28.56 | $12.95 |
| SUMI2011-019 | LABORERMASON TENDER - CEMENT/CONCRETE | $14.01 | $2.45 |
| SUMI2011-019 | LABORERLANDSCAPE & IRRIGATION | $10.47 | $0.00 |
| SUMI2011-019 | LABORERPIPELAYER | $18.32 | $3.28 |
| SUMI2011-019 | LABORERMASON TENDER - BRICK | $18.87 | $2.16 |
| CARP1102-001 | MILLWRIGHT | $40.04 | $26.47 |
| ENGI0324-014 | OPERATORPOWER EQUIPMENT: GROUP 4 BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 |
| ENGI0324-014 | OPERATORPOWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 |
| ENGI0324-014 | OPERATORPOWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 |
| ENGI0324-014 | OPERATORPOWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR/TRACKHOE; CONCRETE PUMP; CRANE; GRADER/BLADE; HIGHLIFT; HOIST; ROLLER; SCRAPER; STIFF LEG DERRICK; TRENCHER; STIFF LEG DERRICK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 |
| ENGI0324-014 | OPERATORPOWER EQUIPMENT: GROUP 7 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 |
| ENGI0324-014 | OPERATORPOWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 |
| ENGI0324-014 | OPERATORPOWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 |
| SUMI2011-019 | OPERATORLOADER | $17.16 | $4.05 |
| SUMI2011-019 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $16.50 | $6.17 |
| SUMI2011-019 | OPERATORBULLDOZER | $18.50 | $5.81 |
| SUMI2011-019 | OPERATORTRACTOR | $15.72 | $1.92 |
| PAIN0845-006 | PAINTERBRUSH AND SPRAY | $28.75 | $18.68 |
| SUMI2011-019 | PAINTERROLLER | $16.21 | $2.81 |
| PLUM0174-002 | PIPEFITTER(INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION) | $47.40 | $23.35 |
| PLUM0174-002 | PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION | $47.40 | $23.35 |
| SUMI2011-019 | ROOFER | $13.86 | $6.11 |
| SUMI2011-019 | SHEET METAL WORKER(HVAC DUCT INSTALLATION ONLY) | $22.28 | $7.95 |
| SHEE0007-014 | SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $35.41 | $15.86 |
| SUMI2011-019 | SPRINKLER FITTER(FIRE SPRINKLERS) | $17.88 | $4.73 |
| BRMI0009-002 | TILE FINISHER FOOTNOTEPAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $27.94 | $21.15 |
| BRMI0009-002 | TILE SETTER FOOTNOTEPAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $32.20 | $23.46 |
| SUMI2011-019 | TRUCK DRIVERTRACTOR HAUL TRUCK | $13.57 | $1.18 |
| SUMI2011-019 | TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $17.00 | $5.71 |