Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Michigan: Muskegon. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0047-002 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 |
| BOIL0169-001 | BOILERMAKER | $43.50 | $36.74 |
| BRMI0009-003 | BRICKLAYER FOOTNOTEPAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $35.83 | $22.18 |
| CARP0100-002 | CARPENTER(INCLUDING FORM WORK; EXCLUDING DRYWALL HANGING) | $31.50 | $21.15 |
| SUMI2011-018 | CARPENTER(DRYWALL HANGING ONLY) | $17.26 | $2.69 |
| PLAS0016-001 | CEMENT MASON/CONCRETE FINISHER |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $21.15 |
| $12.78 |
| SUMI2011-018 | ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF HVAC/TEMPERATURE CONTROLS | $22.69 | $9.10 |
| SUMI2011-018 | HVAC MECHANIC(INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT) | $18.92 | $4.71 |
| SUMI2011-018 | HVAC MECHANIC(LOW VOLTAGE WIRING AND INSTALLATION OF HVAC TEMPERATURE CONTROLS) | $21.32 | $8.01 |
| IRON0025-005 | IRONWORKERREINFORCING | $36.55 | $29.51 |
| IRON0025-005 | IRONWORKERSTRUCTURAL | $36.55 | $29.51 |
| SUMI2011-018 | IRONWORKER, ORNAMENTAL | $18.48 | $7.93 |
| LABO0355-025 | LABORERCOMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK; SANDBLASTER | $28.56 | $12.95 |
| SUMI2011-018 | LABORERPIPELAYER | $18.32 | $3.28 |
| SUMI2011-018 | LABORERLANDSCAPE & IRRIGATION | $8.93 | $1.62 |
| SUMI2011-018 | LABORERMASON TENDER - CEMENT/CONCRETE | $14.82 | $3.59 |
| ENGI0324-034 | OPERATORPOWER EQUIPMENT: GROUP 5 OILER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 |
| ENGI0324-034 | OPERATORPOWER EQUIPMENT: GROUP 4 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 |
| ENGI0324-034 | OPERATORPOWER EQUIPMENT: GROUP 3 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 |
| ENGI0324-034 | OPERATORPOWER EQUIPMENT: GROUP 2 BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 |
| ENGI0324-034 | OPERATORPOWER EQUIPMENT: GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; CONCRETE PUMP; GRADER/BLADE; HIGHLIFT; HOIST; ROLLER; SCRAPER; TRENCHER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 |
| SUMI2011-018 | OPERATORTRACTOR | $15.72 | $1.92 |
| SUMI2011-018 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $14.96 | $4.01 |
| SUMI2011-018 | OPERATORBULLDOZER | $17.56 | $4.95 |
| SUMI2011-018 | OPERATORCRANE | $19.13 | $7.02 |
| SUMI2011-018 | OPERATORLOADER | $16.38 | $3.44 |
| PAIN0845-006 | PAINTERBRUSH AND SPRAY | $28.75 | $18.68 |
| SUMI2011-018 | PAINTERROLLER | $17.28 | $3.43 |
| PLUM0174-002 | PIPEFITTER(INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION) | $47.40 | $23.35 |
| PLUM0174-002 | PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION | $47.40 | $23.35 |
| ROOF0070-005 | ROOFER | $32.65 | $14.80 |
| SUMI2011-018 | SHEET METAL WORKER(HVAC DUCT INSTALLATION ONLY) | $19.05 | $6.51 |
| SHEE0007-014 | SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $35.41 | $15.86 |
| SUMI2011-018 | SPRINKLER FITTER(FIRE SPRINKLERS) | $16.70 | $4.02 |
| BRMI0009-003 | TILE FINISHER FOOTNOTEPAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $27.94 | $21.15 |
| BRMI0009-003 | TILE SETTER FOOTNOTEPAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $32.20 | $23.46 |
| SUMI2011-018 | TRUCK DRIVERDUMP TRUCK | $17.00 | $5.71 |
| SUMI2011-018 | TRUCK DRIVERTRACTOR HAUL TRUCK | $13.57 | $1.18 |