Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Michigan: Monroe. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| TEAM0247-002 | $67.10 PER DAY | $31.28 | $0.70 |
| ASBE0045-005 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $37.00 | $23.85 |
| BOIL0085-003 | BOILERMAKER | $43.50 | $37.64 |
| BRMI0001-001 | BRICKLAYER | $41.66 | $26.53 |
| CARP0687-004 | CARPENTER(INCLUDING ACOUSTICAL CEILING INSTALLATION; DRYWALL HANGING, FINISHING/TAPING; FORM WORK; METAL STUD INSTALLATION; & SCAFFOLD BUILDING) | $42.44 | $31.43 |
| PLAS0067-001 | CEMENT MASON/CONCRETE FINISHER | $30.63 | $14.07 |
| TEAM0247-002 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| DAY |
| $31.18 |
| $0.70 |
| ELEC0008-006 | ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING | $48.40 | $17.79 |
| PAIN0357-002 | GLAZIER PAID HOLIDAYSNEW YEAR'S DAY, DECORATION DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE EMPLOYEE HAS WORKED THE LAST FULL REGULAR SCHEDULED WORK DAY PRIOR TO THE HOLIDAY, AND THE FIRST FULL REGULAR SCHEDULED WORK DAY FOLLOWING THE HOLIDAY, PROVIDED THE EMPLOYEE IS PHYSICALLY ABLE TO WORK | $42.00 | $25.55 |
| IRON0055-014 | IRONWORKERREINFORCING & STRUCTURAL | $35.50 | $29.20 |
| SUMI2011-017 | IRONWORKER, ORNAMENTAL | $18.48 | $7.93 |
| LABO0334-005 | LABORERLANDSCAPE & IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 |
| LABO0334-005 | LABORERLANDSCAPE & IRRIGATION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 |
| LABO0499-003 | LABORERCOMMON OR GENERAL; GRADE CHECKER; SANDBLASTER | $38.58 | $15.70 |
| LABO0499-003 | LABORERMASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE | $38.80 | $15.70 |
| CARP1102-002 | MILLWRIGHT | $42.92 | $39.13 |
| ENGI0324-017 | OPERATORPOWER EQUIPMENT: GROUP 9 OILER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $35.29 | $25.35 |
| ENGI0324-017 | OPERATORPOWER EQUIPMENT: GROUP 4 CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $47.99 | $25.35 |
| ENGI0324-017 | OPERATORPOWER EQUIPMENT: GROUP 3 CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $48.29 | $25.35 |
| ENGI0324-017 | OPERATORPOWER EQUIPMENT: GROUP 5 CRANE WITH BOOM AND JIB OR LEADS 120' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $47.17 | $25.35 |
| ENGI0324-017 | OPERATORPOWER EQUIPMENT: GROUP 7 BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID LOADER, BROOM/SWEEPER, BULLDOZER, GRADER/BLADE, HIGHLIFT, HOIST, LOADER, ROLLER, SCRAPER, TRACTOR & TRENCHER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE AP | $45.34 | $25.35 |
| ENGI0324-017 | OPERATORPOWER EQUIPMENT: GROUP 8 FORKLIFT & EXTEND-A-BOOM FORKLIFT FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $43.63 | $25.35 |
| ENGI0324-017 | OPERATORPOWER EQUIPMENT: GROUP 2 CRANE WITH BOOM AND JIB OR LEADS 300' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $48.79 | $25.35 |
| ENGI0324-017 | OPERATORPOWER EQUIPMENT: GROUP 1 CRANE WITH BOOM AND JIB OR LEADS 400' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $51.29 | $25.35 |
| ENGI0324-017 | OPERATORPOWER EQUIPMENT: GROUP 6 REGULAR CRANE OPERATOR, AND CONCRETE PUMP WITH BOOM OPERATOR FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $46.31 | $25.35 |
| PAIN0022-006 | PAINTERSPRAY | $26.86 | $17.66 |
| PAIN0022-006 | PAINTERBRUSH AND ROLLER | $32.85 | $20.41 |
| PLUM0671-001 | PIPEFITTER(INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION) | $46.71 | $26.79 |
| PLUM0671-001 | PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION | $46.71 | $26.79 |
| ROOF0134-002 | ROOFER | $30.73 | $26.82 |
| SHEE0033-014 | SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $30.80 | $21.51 |
| BRMI0001-001 | TILE FINISHER | $33.50 | $23.52 |
| BRMI0001-001 | TILE SETTER | $40.53 | $23.62 |
| SUMI2011-017 | TRUCK DRIVERTRACTOR HAUL TRUCK | $13.57 | $1.18 |
| TEAM0247-002 | TRUCK DRIVERGROUP 2 SEMI PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. IF ANY OF THE ABOVE HOLIDAYS FALL ON A SUNDAY, THE FOLLOWING MONDAY SHALL BE CONSIDERED THE HOLIDAY AND, IF WORK IS PERFORMED, THE RATE SHALL BE DOUBLE TIME. FOOTNOTE: A | $456.70 | PER WEEK, PLUS $67.10 PER |
| TEAM0247-002 | TRUCK DRIVERGROUP 3 LOWBOY PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. IF ANY OF THE ABOVE HOLIDAYS FALL ON A SUNDAY, THE FOLLOWING MONDAY SHALL BE CONSIDERED THE HOLIDAY AND, IF WORK IS PERFORMED, THE RATE SHALL BE DOUBLE TIME. FOOTNOTE: A | $456.70 | PER WEEK, PLUS |
| TEAM0247-002 | TRUCK DRIVER DUMPGROUP 1 DUMP, FLATBED; PICKUP PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. IF ANY OF THE ABOVE HOLIDAYS FALL ON A SUNDAY, THE FOLLOWING MONDAY SHALL BE CONSIDERED THE HOLIDAY AND, IF WORK IS PERFORMED, THE RATE SHALL BE DOUBLE TIME. FOOTNOTE: A | $456.70 | PER WEEK, PLUS $67.10 PER DAY...............$ 31.03 0.70 |