Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Michigan: Kent. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0047-002 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 |
| BOIL0169-001 | BOILERMAKER | $43.50 | $36.74 |
| SUMI2011-013 | BRICKLAYER | $21.45 | $5.00 |
| SUMI2011-013 | CARPENTER(ACOUSTICAL CEILING INSTALLATION ONLY) | $18.61 | $2.69 |
| SUMI2011-013 | CARPENTER(FORM WORK ONLY) | $18.62 | $6.42 |
| SUMI2011-013 | CARPENTER(DRYWALL HANGING ONLY) | $16.28 | $2.69 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| SUMI2011-013 |
| CARPENTER(DRYWALL FINISHING/TAPING ONLY) |
| $17.35 |
| $2.69 |
| SUMI2011-013 | CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, AND FORMWORK | $18.14 | $4.59 |
| SUMI2011-013 | CEMENT MASON/CONCRETE FINISHER | $17.16 | $4.25 |
| SUMI2011-013 | ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING | $20.68 | $6.39 |
| SUMI2011-013 | GLAZIER | $15.29 | $2.68 |
| SUMI2011-013 | HVAC MECHANIC(INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT) | $16.75 | $2.75 |
| SUMI2011-013 | IRONWORKER, ORNAMENTAL | $18.48 | $7.93 |
| IRON0025-013 | IRONWORKER, REINFORCING | $36.55 | $29.51 |
| SUMI2011-013 | IRONWORKER, STRUCTURAL | $18.07 | $4.84 |
| LABO0355-027 | LABORERGRADE CHECKER; SANDBLASTER | $26.34 | $12.95 |
| SUMI2011-013 | LABORERCOMMON OR GENERAL | $13.04 | $4.80 |
| SUMI2011-013 | LABORERPIPELAYER | $18.32 | $3.28 |
| SUMI2011-013 | LABORERMASON TENDER - CEMENT/CONCRETE | $14.01 | $2.45 |
| SUMI2011-013 | LABORERMASON TENDER - BRICK | $18.87 | $2.16 |
| SUMI2011-013 | LABORERLANDSCAPE & IRRIGATION | $10.47 | $0.00 |
| CARP1102-001 | MILLWRIGHT | $40.04 | $26.47 |
| ENGI0324-035 | OPERATORPOWER EQUIPMENT: GROUP 3 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 |
| ENGI0324-035 | OPERATORPOWER EQUIPMENT: GROUP 2 BROOM/SWEEPER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 |
| ENGI0324-035 | OPERATORPOWER EQUIPMENT: GROUP 1 CONCRETE PUMP; GRADER/BLADE; HIGHLIFT; HOIST; ROLLER; SCRAPER; TRENCHER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 |
| ENGI0324-035 | OPERATORPOWER EQUIPMENT: GROUP 4 OILER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 |
| SUMI2011-013 | OPERATORTRACTOR | $15.72 | $1.92 |
| SUMI2011-013 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $20.23 | $9.10 |
| SUMI2011-013 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $16.50 | $6.17 |
| SUMI2011-013 | OPERATORBULLDOZER | $18.50 | $5.81 |
| SUMI2011-013 | OPERATORCRANE | $19.21 | $6.76 |
| SUMI2011-013 | OPERATORFORKLIFT | $21.48 | $9.13 |
| SUMI2011-013 | OPERATORLOADER | $17.16 | $4.05 |
| PAIN0845-006 | PAINTERBRUSH AND SPRAY | $28.75 | $18.68 |
| SUMI2011-013 | PAINTERROLLER | $16.21 | $2.81 |
| PLUM0174-002 | PIPEFITTER(INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION) | $47.40 | $23.35 |
| PLUM0174-002 | PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION | $47.40 | $23.35 |
| SUMI2011-013 | ROOFER | $14.05 | $6.06 |
| SUMI2011-013 | SHEET METAL WORKER(HVAC DUCT INSTALLATION ONLY) | $18.32 | $4.66 |
| SHEE0007-014 | SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $35.41 | $15.86 |
| SUMI2011-013 | SPRINKLER FITTER(FIRE SPRINKLERS) | $17.07 | $4.24 |
| BRMI0009-002 | TILE FINISHER FOOTNOTEPAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $27.94 | $21.15 |
| BRMI0009-002 | TILE SETTER FOOTNOTEPAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $32.20 | $23.46 |
| SUMI2011-013 | TRUCK DRIVERDUMP TRUCK | $17.00 | $5.71 |
| SUMI2011-013 | TRUCK DRIVERTRACTOR HAUL TRUCK | $13.57 | $1.18 |