Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Michigan: Ionia. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0047-002 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 |
| BOIL0169-001 | BOILERMAKER | $43.50 | $36.74 |
| SUMI2011-010 | BRICKLAYER | $21.45 | $5.00 |
| SUMI2011-010 | CARPENTER(ACOUSTICAL CEILING INSTALLATION ONLY) | $18.49 | $2.69 |
| SUMI2011-010 | CARPENTER(FORM WORK ONLY) | $18.62 | $6.42 |
| SUMI2011-010 | CARPENTER(DRYWALL HANGING ONLY) | $17.26 | $2.69 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| CARP0525-011 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK(EXCLUDING TOWNSHIPS OF DANBY, ORANGE, PORTLAND & SEBEWA) |
| $28.29 |
| $21.42 |
| CARP1004-019 | CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK(TOWNSHIPS OF DANBY, ORANGE, PORTLAND & SEBEWA) | $36.21 | $20.91 |
| SUMI2011-010 | CEMENT MASON/CONCRETE FINISHER | $17.16 | $4.25 |
| SUMI2011-010 | DRYWALL FINISHER/TAPER | $15.91 | $2.92 |
| ELEC0275-017 | ELECTRICIANEXCLUDES LOW VOLTAGE WIRING (TOWNSHIPS OF BERLIN, BOSTON, CAMPBELL, EASTON, IONIA, KEENE, LYONS, NORTH PLAINS, ODESSA, ORLEANS, OTISCO & RONALD) | $36.52 | $25.15 |
| ELEC0665-006 | ELECTRICIANEXCLUDES LOW VOLTAGE WIRING (TOWNSHIPS OF ORANGE, PORTLAND, SEBEWA AND DANBY) | $42.98 | $29.75 |
| SUMI2011-010 | GLAZIER | $15.29 | $2.68 |
| SUMI2011-010 | HVAC MECHANIC(INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT) | $16.75 | $2.75 |
| SUMI2011-010 | IRONWORKER, ORNAMENTAL | $18.48 | $7.93 |
| IRON0025-013 | IRONWORKER, REINFORCING | $36.55 | $29.51 |
| SUMI2011-010 | IRONWORKER, STRUCTURAL | $18.13 | $4.88 |
| LABO0355-021 | LABORERCOMMON OR GENERAL; GRADE CHECKER; SANDBLASTER (EXCLUDING THE CITY OF PORTLAND) | $24.90 | $12.95 |
| LABO0499-011 | LABORERCOMMON OR GENERAL; GRADE CHECKER; SANDBLASTER (CITY OF PORTLAND) | $32.53 | $13.45 |
| SUMI2011-010 | LABORERMASON TENDER - CEMENT/CONCRETE | $14.01 | $2.45 |
| SUMI2011-010 | LABORERPIPELAYER | $18.32 | $3.28 |
| SUMI2011-010 | LABORERLANDSCAPE & IRRIGATION | $10.47 | $0.00 |
| SUMI2011-010 | LABORERMASON TENDER - BRICK | $18.87 | $2.16 |
| CARP1102-001 | MILLWRIGHT | $40.04 | $26.47 |
| ENGI0324-034 | OPERATORPOWER EQUIPMENT: GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; CONCRETE PUMP; GRADER/BLADE; HIGHLIFT; HOIST; ROLLER; SCRAPER; TRENCHER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 |
| ENGI0324-034 | OPERATORPOWER EQUIPMENT: GROUP 5 OILER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 |
| ENGI0324-034 | OPERATORPOWER EQUIPMENT: GROUP 4 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 |
| ENGI0324-034 | OPERATORPOWER EQUIPMENT: GROUP 3 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 |
| ENGI0324-034 | OPERATORPOWER EQUIPMENT: GROUP 2 BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 |
| SUMI2011-010 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $16.50 | $6.17 |
| SUMI2011-010 | OPERATORLOADER | $17.16 | $4.05 |
| SUMI2011-010 | OPERATORTRACTOR | $15.72 | $1.92 |
| SUMI2011-010 | OPERATORCRANE | $19.28 | $7.55 |
| SUMI2011-010 | OPERATORBULLDOZER | $18.50 | $5.81 |
| PAIN0845-007 | PAINTERBRUSH AND SPRAY | $28.75 | $18.68 |
| SUMI2011-010 | PAINTERROLLER | $16.21 | $2.81 |
| PLUM0174-005 | PIPEFITTERINCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION (REMAINDER OF COUNTY) | $47.40 | $23.35 |
| PLUM0333-002 | PIPEFITTERINCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION FOOTNOTE: PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY, IF THE EMPLOYEE WORKS THE WORK DAY PRECEDING AND FOLLOWING THE HOLIDAY UNLESS PROVEN ILLNESS OR INJURY PREVENTS THE EMPLOYEE FROM WORKING | $46.29 | $25.43 |
| PLUM0174-005 | PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION(REMAINDER OF COUNTY) | $47.40 | $23.35 |
| PLUM0333-002 | PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION(TOWNSHIPS OF DANBY & PORTLAND) FOOTNOTE: PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY, IF THE EMPLOYEE WORKS THE WORK DAY PRECEDING AND FOLLOWING THE HOLIDAY UNLESS PROVEN ILLNESS OR INJURY PREVENTS THE EMPLOYEE FROM WORKING | $46.29 | $25.43 |
| SHEE0007-004 | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 2: GROUP 1 (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $42.74 | $21.53 |
| SUMI2011-010 | ROOFER | $13.86 | $6.11 |
| SUMI2011-010 | SPRINKLER FITTER(FIRE SPRINKLERS) | $17.88 | $4.73 |
| BRMI0009-008 | TILE FINISHER | $27.94 | $21.15 |
| BRMI0009-008 | TILE SETTER | $32.20 | $23.46 |
| SUMI2011-010 | TRUCK DRIVERDUMP TRUCK | $17.00 | $5.71 |
| SUMI2011-010 | TRUCK DRIVERTRACTOR HAUL TRUCK | $13.57 | $1.18 |