Pulling the wage determination…
Revision 2 · modified July 20, 2026 · published July 20, 2026 · Building
Covers 1 county in Michigan: Ingham. View the source document on SAM.gov.
DOL marked this determination modified July 20, 2026 (revision 2). The classifications that moved are listed below, old→new.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0047-002 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 |
| BOIL0169-001 | BOILERMAKER | $43.50 | $36.74 |
| BRMI0009-009 | BRICKLAYERBRICKLAYER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $36.10 | $26.22 |
| BRMI0009-009 | BRICKLAYERTERRAZZO AND TILE FINISHER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $32.20 | $20.74 |
| BRMI0009-009 | BRICKLAYERTERRAZZO AND TILE SETTER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR |
Parsed from the SAM.gov document, synced July 25, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $32.20 |
| $23.46 |
| CARP1004-004 | CARPENTER(SOFT FLOOR LAYER, INCLUDING CARPET & RESILIENT FLOORING) | $36.21 | $21.06 |
| CARP1004-018 | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $36.21 | $21.06 |
| PLAS0016-011 | CEMENT MASON/CONCRETE FINISHER | $24.64 | $12.88 |
| ELEC0252-001 | ELECTRICIANALARM INSTALLATION & LOW VOLTAGE WIRING (TOWNSHIPS OF BUNKER HILL, LESLIE, ONODAGA & STOCKBRIDGE) | $38.79 | $19.87 |
| ELEC0252-001 | ELECTRICIANEXCLUDES ALARM INSTALLATION AND LOW VOLTAGE WIRING (TOWNSHIPS OF BUNKER HILL, LESLIE, ONODAGA & STOCKBRIDGE) | $56.05 | $30.52 |
| ELEC0665-004 | ELECTRICIANALARM INSTALLATION & LOW VOLTAGE WIRING (TOWNSHIPS OF ALAIEDON, AURELIUS, DELHI, INGHAM, LANSING, LEROY, LOCKE, MERIDIAN, VEVAY, WHEATFIELD, WHITE OAK AND WILLIAMSON) | $37.05 | $22.97 |
| ELEC0665-004 | ELECTRICIANEXCLUDES ALARM INSTALLATION & LOW VOLTAGE WIRING (TOWNSHIPS OF ALAIEDON, AURELIUS, DELHI, INGHAM, LANSING, LEROY, LOCKE, MERIDIAN, VEVAY, WHEATFIELD, WHITE OAK AND WILLIAMSON) | $47.00 | $33.18 |
| IRON0025-001 | IRONWORKERSTRUCTURAL (EXCLUDING METAL BUILDING ERECTION) | $36.55 | $35.60 |
| IRON0025-001 | IRONWORKERREINFORCING | $36.55 | $33.37 |
| SUMI2011-009 | IRONWORKER, ORNAMENTAL | $18.48 | $7.93 |
| LABO0499-012 | LABORERCOMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; PIPELAYER; SANDBLASTER | $32.53 | $13.45 |
| SUMI2011-009 | LABORERLANDSCAPE & IRRIGATION | $8.00 | $0.00 |
| SUMI2011-009 | METAL BUILDING ERECTOR | $16.92 | $6.32 |
| CARP1102-002 | MILLWRIGHT | $42.92 | $39.13 |
| ENGI0324-012 | OPERATORPOWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 |
| ENGI0324-012 | OPERATORPOWER EQUIPMENT: GROUP 3 CONCRETE PUMP; CRANE; HIGHLIFT; HOIST; LOADER; ROLLER; SCRAPER; STIFF LEG DERRICK; TRENCHER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 |
| ENGI0324-012 | OPERATORPOWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 |
| ENGI0324-012 | OPERATORPOWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 |
| ENGI0324-012 | OPERATORPOWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 |
| ENGI0324-012 | OPERATORPOWER EQUIPMENT: GROUP 7 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 |
| ENGI0324-012 | OPERATORPOWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 |
| SUMI2011-009 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $21.34 | $7.57 |
| SUMI2011-009 | OPERATORTRACTOR | $19.10 | $8.48 |
| SUMI2011-009 | OPERATORGRADER/BLADE | $22.00 | $6.29 |
| SUMI2011-009 | OPERATORBULLDOZER | $20.63 | $8.21 |
| PAIN0845-001 | PAINTERDRYWALL FINISHING/TAPING | $28.32 | $16.88 |
| PAIN0845-001 | PAINTERBRUSH, ROLLER, SPRAY AND PAPERHANGING | $28.75 | $18.68 |
| PLUM0333-006 | PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION FOOTNOTEPAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY, IF THE EMPLOYEE WORKS THE WORK DAY PRECEDING AND FOLLOWING THE HOLIDAY UNLESS PROVEN ILLNESS OR INJURY PREVENTS THE EMPLOYEE FROM WORKING | $46.29 | $25.43 |
| PLUM0333-006 | PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION FOOTNOTEPAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY, IF THE EMPLOYEE WORKS THE WORK DAY PRECEDING AND FOLLOWING THE HOLIDAY UNLESS PROVEN ILLNESS OR INJURY PREVENTS THE EMPLOYEE FROM WORKING | $46.29 | $25.43 |
| SHEE0007-004 | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 2: GROUP 1 (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $42.74 | $21.53 |
| ROOF0070-003 | ROOFER | $33.18 | $17.22 |
| SFMI0669-001 | SPRINKLER FITTER(FIRE SPRINKLERS) | $41.34 | $27.39 |
| SUMI2011-009 | TRUCK DRIVERTRACTOR HAUL TRUCK | $13.57 | $1.18 |
| SUMI2011-009 | TRUCK DRIVERDUMP TRUCK | $16.00 | $7.26 |
| SUMI2011-009 | TRUCK DRIVERLOWBOY TRUCK | $14.50 | $0.44 |