Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Michigan: Clinton. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0047-002 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 |
| BOIL0169-001 | BOILERMAKER | $43.50 | $36.74 |
| BRMI0009-016 | BRICKLAYERTERRAZZO AND TILE SETTER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $32.20 | $23.46 |
| CARP1004-004 | CARPENTER(SOFT FLOOR LAYER, INCLUDING CARPET & RESILIENT FLOORING) | $36.21 | $21.06 |
| CARP1004-007 | CARPENTER(ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK AND METAL STUD INSTALLATION ONLY) | $36.21 | $21.06 |
| SUMI2011-006 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, METAL STUD INSTALLATION, AND CARPET/RESILIENT FLOOR INSTALLATION |
| $20.41 |
| $5.69 |
| PLAS0016-011 | CEMENT MASON/CONCRETE FINISHER | $24.64 | $12.88 |
| ELEC0665-001 | ELECTRICIAN(EXCLUDES ALARM INSTALLATION & LOW VOLTAGE WIRING) | $40.50 | $28.30 |
| IRON0025-001 | IRONWORKERSTRUCTURAL (EXCLUDING METAL BUILDING ERECTION) | $36.55 | $35.60 |
| IRON0025-001 | IRONWORKERREINFORCING | $36.55 | $33.37 |
| SUMI2011-006 | IRONWORKER, ORNAMENTAL | $18.48 | $7.93 |
| LABO0499-012 | LABORERCOMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; PIPELAYER; SANDBLASTER | $32.53 | $13.45 |
| SUMI2011-006 | LABORERLANDSCAPE & IRRIGATION | $12.50 | $0.50 |
| SUMI2011-006 | METAL BUILDING ERECTOR | $16.92 | $6.32 |
| CARP1102-002 | MILLWRIGHT | $42.92 | $39.13 |
| ENGI0324-010 | OPERATORPOWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 |
| ENGI0324-010 | OPERATORPOWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 |
| ENGI0324-010 | OPERATORPOWER EQUIPMENT: GROUP 3 CONCRETE PUMP; CRANE; HIGHLIFT; HOIST; ROLLER; SCRAPER; STIFF LEG DERRICK; TRENCHER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 |
| ENGI0324-010 | OPERATORPOWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 |
| ENGI0324-010 | OPERATORPOWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 |
| ENGI0324-010 | OPERATORPOWER EQUIPMENT: GROUP 7 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 |
| ENGI0324-010 | OPERATORPOWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 |
| SUMI2011-006 | OPERATORGRADER/BLADE | $22.00 | $6.29 |
| SUMI2011-006 | OPERATORBULLDOZER | $19.73 | $7.02 |
| SUMI2011-006 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $21.94 | $8.72 |
| SUMI2011-006 | OPERATORLOADER | $19.75 | $9.98 |
| SUMI2011-006 | OPERATORTRACTOR | $19.10 | $8.48 |
| PAIN0845-001 | PAINTERDRYWALL FINISHING/TAPING | $28.32 | $16.88 |
| PAIN0845-001 | PAINTERBRUSH, ROLLER, SPRAY AND PAPERHANGING | $28.75 | $18.68 |
| PLUM0333-006 | PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION FOOTNOTEPAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY, IF THE EMPLOYEE WORKS THE WORK DAY PRECEDING AND FOLLOWING THE HOLIDAY UNLESS PROVEN ILLNESS OR INJURY PREVENTS THE EMPLOYEE FROM WORKING | $46.29 | $25.43 |
| PLUM0333-006 | PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION FOOTNOTEPAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY, IF THE EMPLOYEE WORKS THE WORK DAY PRECEDING AND FOLLOWING THE HOLIDAY UNLESS PROVEN ILLNESS OR INJURY PREVENTS THE EMPLOYEE FROM WORKING | $46.29 | $25.43 |
| ROOF0070-003 | ROOFER | $33.18 | $17.22 |
| SHEE0007-019 | SHEET METAL WORKER(INCLUDING HVAC DUCT WORK; EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) | $42.74 | $21.53 |
| SFMI0669-001 | SPRINKLER FITTER(FIRE SPRINKLERS) | $41.34 | $27.39 |
| SUMI2011-006 | TRUCK DRIVERLOWBOY TRUCK | $14.50 | $0.44 |
| SUMI2011-006 | TRUCK DRIVERTRACTOR HAUL TRUCK | $13.57 | $1.18 |
| SUMI2011-006 | TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $16.00 | $7.26 |