Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Heavy
Covers 1 county in Michigan: Van Buren. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| CARP0525-006 | CARPENTER, INCLUDES FORM WORK | $28.29 | $21.42 |
| PLAS0016-025 | CEMENT MASON/CONCRETE FINISHER(TWPS OF SOUTH HAVEN, COVERT, GENEVA, BANGOR, HARTFORD, KEELER, HAMILTON, LAWRENCE, ARLINGTON & COLUMBIA) | $24.63 | $12.88 |
| PLAS0016-025 | CEMENT MASON/CONCRETE FINISHER(TWPS OF BLOOMINGDALE, WAVERLY, PAW PAW, DECATUR, PORTER, ANTWERP, ALMENA & PINEGROVE) | $22.31 | $12.83 |
| TEAM0007-011 | DAILY | $33.55 | $0.75 |
| ELEC0131-006 | ELECTRICIAN | $42.78 | $21.84 |
| IRON0025-011 | IRONWORKERREINFORCING | $36.55 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $34.04 |
| IRON0025-011 | IRONWORKERSTRUCTURAL | $36.55 | $34.04 |
| LABO0334-011 | LABORER((4) GRADE CHECKER) | $22.73 | $12.95 |
| LABO0334-011 | LABORER((1) COMMON OR GENERAL) | $22.42 | $12.95 |
| LABO0334-011 | LABORER((2) MASON TENDER-CEMENT/CONCRETE) | $22.55 | $12.95 |
| LABO0334-011 | LABORER((5) PIPELAYER) | $22.85 | $12.95 |
| LABO0355-010 | LABORER(COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE) (EXCLUDES OPEN CUT CONSTRUCTION) | $27.21 | $13.45 |
| SUMI2010-071 | LABORERLANDSCAPE | $12.25 | $0.00 |
| ENGI0326-010 | OPERATORPOWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE | $41.32 | $25.25 |
| ENGI0326-010 | OPERATORPOWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE | $48.98 | $25.25 |
| ENGI0326-010 | OPERATORPOWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BORING MACHINE; BULLDOZER; GRADER/BLADE; ROLLER; SCRAPER; TRACTOR; TRENCHER; REGULAR CRANE AND STIFF LEG DERRICK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE | $44.00 | $25.25 |
| ENGI0326-010 | OPERATORPOWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE | $45.68 | $25.25 |
| ENGI0326-010 | OPERATORPOWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE | $35.46 | $25.25 |
| ENGI0326-010 | OPERATORPOWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE | $41.32 | $25.25 |
| SUMI2010-071 | OPERATORLOADER | $19.19 | $6.00 |
| SUMI2010-071 | OPERATORBACKHOE/EXCAVATOR | $19.09 | $2.48 |
| PAIN0312-014 | PAINTERBRUSH & ROLLER | $21.75 | $11.94 |
| PAIN0312-014 | PAINTERSPRAY | $22.75 | $11.94 |
| PLUM0357-011 | PLUMBER | $35.20 | $22.35 |
| ENGI0325-018 | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION(INCLUDING SEWER): GROUP 1 BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 |
| ENGI0325-018 | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION(INCLUDING SEWER): GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 |
| ENGI0325-018 | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION(INCLUDING SEWER): GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 |
| ENGI0325-018 | POWER EQUIPMENT OPERATO, UNDERGROUND CONSTRUCTION(INCLUDING SEWER)R: GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 |
| SUMI2010-071 | TRUCK DRIVERDUMP TRUCK | $18.00 | $6.43 |
| SUMI2010-071 | TRUCK DRIVEROFF THE ROAD TRUCK | $20.82 | $3.69 |
| TEAM0007-011 | TRUCK DRIVERTRACTOR HAUL TRUCK FOOTNOTE: A | $470.70 | PER WEEK. B. $68.70 DAILY.................$ 33.30 0.75 |
| TEAM0007-011 | TRUCK DRIVERLOWBOY/SEMI-TRAILER TRUCK FOOTNOTE: A | $470.70 | PER WEEK. B. $68.70 |