Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Heavy
Covers 1 county in Michigan: Macomb. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| TEAM0007-006 | $68.70 DAILY | $33.40 | $0.75 |
| BOIL0169-003 | BOILERMAKER | $43.50 | $36.74 |
| CARP0687-008 | CARPENTER, INCLUDES FORM WORK | $42.44 | $31.43 |
| PLAS0067-002 | CEMENT MASON/CONCRETE FINISHER | $30.63 | $14.07 |
| TEAM0007-006 | DAILY | $33.65 | $0.75 |
| ELEC0058-007 | ELECTRICIAN | $51.32 | $28.54 |
| IRON0025-006 | IRONWORKERREINFORCING | $36.55 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $33.37 |
| IRON0025-006 | IRONWORKERSTRUCTURAL | $36.55 | $35.93 |
| LABO0334-021 | LABORER((5) PIPELAYER) | $24.17 | $16.95 |
| LABO0334-021 | LABORER((4) GRADE CHECKER) | $24.11 | $16.95 |
| LABO1191-004 | LABORERSCOMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER (EXCLUDES OPEN CUT CONSTRUCTION) | $38.00 | $18.25 |
| LABO0334-009 | LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTIONGROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 |
| LABO0334-009 | LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTIONGROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 |
| ELEC0017-003 | LINE CONSTRUCTIONLINEMEN/CABLE SPLICER | $61.06 | $25.11 |
| ENGI0326-008 | OPERATORPOWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 CRANE WITH BOOM & JIB OR LEADS 300' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $49.79 | $25.35 |
| ENGI0326-008 | OPERATORPOWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 REGULAR CRANE OPERATOR FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $46.31 | $25.35 |
| ENGI0326-008 | OPERATORPOWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 7 BACKHOE/EXCAVATOR, BOBCAT/SKID LOADER, BORING MACHINE, BROOM/SWEEPER, BULLDOZER, GRADER/BLADE, LOADER, ROLLER, SCRAPER, TRACTOR, TRENCHER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $45.34 | $25.35 |
| ENGI0326-008 | OPERATORPOWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 8 FORKLIFT FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $43.63 | $25.35 |
| ENGI0326-008 | OPERATORPOWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5 CRANE WITH BOOM & JIB OR LEADS 120' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $47.17 | $25.35 |
| ENGI0326-008 | OPERATORPOWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 CRANE WITH BOOM & JIB OR LEADS 140' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $47.99 | $25.35 |
| ENGI0326-008 | OPERATORPOWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 CRANE WITH BOOM & JIB OR LEADS 400' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $51.29 | $25.35 |
| ENGI0326-008 | OPERATORPOWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 9 OILER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $35.29 | $25.35 |
| ENGI0326-008 | OPERATORPOWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 CRANE WITH BOOM & JIB OR LEADS 220' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $48.29 | $25.35 |
| PAIN0022-005 | PAINTERBRUSH & ROLLER | $25.06 | $14.75 |
| PAIN0022-005 | PAINTERSPRAY | $25.86 | $14.75 |
| CARP0687-008 | PILEDRIVERMAN | $38.48 | $30.22 |
| PLUM0636-002 | PIPEFITTER | $40.41 | $29.35 |
| PLUM0098-005 | PLUMBER | $35.77 | $35.13 |
| ENGI0325-019 | POWER EQUIPMENT OPERATORUNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 |
| ENGI0325-019 | POWER EQUIPMENT OPERATORUNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 |
| ENGI0325-019 | POWER EQUIPMENT OPERATORUNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 |
| ENGI0325-019 | POWER EQUIPMENT OPERATORUNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 |
| SUMI2010-063 | TRUCK DRIVEROFF THE ROAD TRUCK | $20.82 | $3.69 |
| TEAM0007-006 | TRUCK DRIVERLOWBOY/SEMI-TRAILER TRUCK FOOTNOTE: A | $470.70 | PER WEEK. B. $68.70 |
| TEAM0007-006 | TRUCK DRIVERDUMP TRUCK, 8 CU. YDS. AND OVER | $33.50 | $0.75 |
| TEAM0007-006 | TRUCK DRIVERDUMP TRUCK UNDER 8 CU. YDS.; TRACTOR HAUL TRUCK FOOTNOTE: A | $470.70 | PER WEEK. B. |