Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Heavy
Covers 1 county in Michigan: Livingston. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| TEAM0007-006 | $68.70 DAILY | $33.40 | $0.75 |
| BOIL0169-003 | BOILERMAKER | $43.50 | $36.74 |
| CARP0687-005 | CARPENTER, INCLUDES FORM WORK(TOWNSHIPS OF BRIGHTON, DEERFIELD, GENOA, GREEN OAK, HAMBURG, HARTLAND, OSCEOLA, PUTNAM, TYRONE & UNADILLA) | $42.44 | $31.43 |
| CARP1004-014 | CARPENTER, INCLUDES FORM WORK(TOWNSHIPS OF COHOCTAH, CONWAY, HANDY, HOWELL, IOSCO & MARION) | $36.21 | $21.06 |
| PLAS0016-022 | CEMENT MASON/CONCRETE FINISHER(TOWNSHIPS OF DEERFIELD, HARTLAND, OSEOLA & TYRONE) | $25.58 | $12.88 |
| PLAS0016-028 | CEMENT MASON/CONCRETE FINISHER |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $24.64 |
| $12.88 |
| PLAS0514-003 | CEMENT MASON/CONCRETE FINISHER(REMAINDER OF COUNTY) | $32.23 | $22.11 |
| TEAM0007-006 | DAILY | $33.65 | $0.75 |
| ELEC0058-010 | ELECTRICIAN(TOWNSHIPS OF DEERFIELD, TYRONE, HARTLAND, OCEOLA, GENOA & BRIGHTON) | $51.32 | $28.54 |
| ELEC0252-008 | ELECTRICIAN(TOWNSHIPS OF GREEN OAK, HAMBURG, PUTNAM AND UNADILLA) | $56.05 | $30.52 |
| ELEC0665-016 | ELECTRICIAN(TOWNSHIPS OF COHOCTAH, CONWAY, HANDY, HOWELL, IOSCO AND MARION) | $45.00 | $31.37 |
| IRON0025-006 | IRONWORKERSTRUCTURAL | $36.55 | $35.93 |
| IRON0025-006 | IRONWORKERREINFORCING | $36.55 | $33.37 |
| LABO0334-026 | LABORER(4) GRADE CHECKER (EASTERN PART OF LIVINGSTON) | $25.50 | $12.95 |
| LABO0334-026 | LABORER(7) LANDSCAPE (EASTERN PART OF LIVINGSTON) | $19.59 | $12.95 |
| LABO0334-026 | LABORER(5) PIPELAYER (EASTERN PART OF LIVINGSTON) | $25.65 | $12.95 |
| LABO0334-026 | LABORER(1) COMMON OR GENERAL (EASTERN PART OF LIVINGSTON) | $25.20 | $12.95 |
| LABO0334-026 | LABORER(2) MASON TENDER-CEMENT/CONCRETE (EASTERN PART OF LIVINGSTON) | $25.31 | $12.95 |
| LABO0334-027 | LABORER(7) LANDSCAPE (WESTERN PART OF LIVINGSTON) | $19.59 | $12.95 |
| LABO0334-027 | LABORER(4) GRADE CHECKER (WESTERN PART OF LIVINGSTON) | $25.50 | $12.95 |
| LABO0334-027 | LABORER(2) MASON TENDER-CEMENT/CONCRETE (WESTERN PART OF LIVINGSTON) | $25.31 | $12.95 |
| LABO0334-027 | LABORER(1) COMMON OR GENERAL (WESTERN PART OF LIVINGSTON) | $25.20 | $12.95 |
| LABO0334-027 | LABORER(5) PIPELAYER (WESTERN PART OF LIVINGSTON) | $25.45 | $12.95 |
| LABO0499-021 | LABORERCOMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER (WEST OF OAK GROVE ROAD TO WEST OF PINKNEY ROAD AND DEXTER PINKNEY ROAD, INCLUDING THE CITY OF HOWELL) (EXCLUDES OPEN CUT CONSTRUCTION) | $32.53 | $13.45 |
| LABO1076-007 | LABORERCOMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER (EAST OF OAK GROVE ROAD AND NORTH OF M-59, NOT INCLUDING THE CITY OF HOWELL) (EXCLUDES OPEN CUT CONSTRUCTION) | $38.00 | $18.25 |
| LABO0499-019 | LABORER, EXCLUDES OPEN CUT CONSTRUCTIONGROUP 3 PIPELAYER (EAST OF OAK GROVE ROAD AND SOUTH OF M-59, NOT INCLUDING THE CITY OF HOWELL) | $38.47 | $15.45 |
| LABO0499-019 | LABORER, EXCLUDES OPEN CUT CONSTRUCTIONGROUP 1 COMMON OR GENERAL; GRADE CHECKER (EAST OF OAK GROVE ROAD AND SOUTH OF M-59, NOT INCLUDING THE CITY OF HOWELL) COMMON OR GENERAL; GRADE CHECKER | $38.11 | $15.45 |
| LABO0499-019 | LABORER, EXCLUDES OPEN CUT CONSTRUCTIONGROUP 2 MASON TENDER - CEMENT/CONCRETE (EAST OF OAK GROVE ROAD AND SOUTH OF M-59, NOT INCLUDING THE CITY OF HOWELL) | $38.33 | $15.45 |
| LABO0334-009 | LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTIONGROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 |
| LABO0334-009 | LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTIONGROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 |
| ELEC0017-009 | LINE CONSTRUCTIONLINEMEN/CABLE SPLICER (TOWNSHIPS OF BRIGHTON, CONWAY, GENOA, GREEN OAK, HAMBURG, HANDY, HARTLAND, HOWELL, IOSCO, MARION, OCEOLA & PUTNAM) | $61.06 | $25.11 |
| ELEC0876-004 | LINE CONSTRUCTIONCABLE SPLICER (TOWNSHIPS OF COHOCTAH, DEERFIELD, TYRONE & UNADILLA) | $55.65 | $23.64 |
| ELEC0876-004 | LINE CONSTRUCTIONLINEMAN (TOWNSHIPS OF COHOCTAH, DEERFIELD, TYRONE & UNADILLA) | $54.41 | $23.28 |
| ENGI0326-019 | OPERATORPOWER EQUIPMENT: GROUP 3 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.32 | $25.25 |
| ENGI0326-019 | OPERATORPOWER EQUIPMENT: GROUP 1 BACKHOE/EXCAVATOR; BORING MACHINE; GRADER/BLADE; LOADER; ROLLER; SCRAPER; TRACTOR; TRENCHER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 |
| ENGI0326-019 | OPERATORPOWER EQUIPMENT: GROUP 4 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $35.46 | $25.25 |
| ENGI0326-019 | OPERATORPOWER EQUIPMENT: GROUP 2 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.32 | $25.25 |
| SUMI2010-062 | OPERATORBULLDOZER | $18.00 | $5.00 |
| SUMI2010-062 | OPERATORCRANE | $22.00 | $5.00 |
| PAIN0022-009 | PAINTERBRUSH & ROLLER (EAST OF HOWELL, NORTH TO GENESEE COUNTY & SOUTH TO WASHTENAW COUNTY) | $25.06 | $14.75 |
| PAIN0022-009 | PAINTERSPRAY (EAST OF HOWELL, NORTH TO GENESEE COUNTY & SOUTH TO WASHTENAW COUNTY) | $25.86 | $14.75 |
| PAIN0845-021 | PAINTER(CITY OF HOWELL & WEST OF HOWELL, NORTH TO GENESEE COUNTY & SOUTH TO WASHTENAW COUNTY) | $21.89 | $11.85 |
| CARP0687-005 | PILEDRIVERMAN(TOWNSHIPS OF BRIGHTON, DEERFIELD, GENOA, GREEN OAK, HAMBURG, HARTLAND, OSCEOLA, PUTNAM, TYRONE & UNADILLA) | $38.48 | $30.22 |
| CARP1004-014 | PILEDRIVERMAN(TOWNSHIPS OF COHOCTAH, CONWAY, HANDY, HOWELL, IOSCO & MARION) | $26.46 | $20.71 |
| PLUM0636-010 | PIPEFITTER(TOWNSHIP OF BRIGHTON) | $40.41 | $29.35 |
| PLUM0098-010 | PLUMBER(TOWNSHIP OF BRIGHTON) | $35.77 | $35.13 |
| PLUM0190-011 | PLUMBER/PIPEFITTER(TOWNSHIPS OF GREEN OAK & HAMBURG) | $44.31 | $23.70 |
| PLUM0333-023 | PLUMBER/PIPEFITTER(REMAINDER OF COUNTY) | $42.29 | $23.94 |
| ENGI0325-017 | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION(INCLUDING SEWER): GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 |
| ENGI0325-017 | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION(INCLUDING SEWER): GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 |
| ENGI0325-017 | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION(INCLUDING SEWER): GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 |
| ENGI0325-017 | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION(INCLUDING SEWER): GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 |
| SUMI2010-062 | TRUCK DRIVEROFF THE ROAD TRUCK | $20.82 | $3.69 |
| TEAM0007-006 | TRUCK DRIVERDUMP TRUCK, 8 CU. YDS. AND OVER | $33.50 | $0.75 |
| TEAM0007-006 | TRUCK DRIVERLOWBOY/SEMI-TRAILER TRUCK FOOTNOTE: A | $470.70 | PER WEEK. B. $68.70 |
| TEAM0007-006 | TRUCK DRIVERDUMP TRUCK UNDER 8 CU. YDS.; TRACTOR HAUL TRUCK FOOTNOTE: A | $470.70 | PER WEEK. B. |