Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Heavy
Covers 1 county in Michigan: Jackson. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| TEAM0007-008 | $68.70 DAILY | $33.30 | $0.75 |
| CARP1004-001 | CARPENTER, INCLUDES FORM WORK | $35.41 | $21.06 |
| PLAS0016-027 | CEMENT MASON/CONCRETE FINISHER | $24.64 | $12.88 |
| TEAM0007-008 | DAILY | $33.55 | $0.75 |
| ELEC0252-009 | ELECTRICIAN | $56.05 | $30.52 |
| IRON0025-006 | IRONWORKERREINFORCING | $36.55 | $33.37 |
| IRON0025-006 | IRONWORKERSTRUCTURAL |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $36.55 |
| $35.93 |
| LABO0334-015 | LABORER((2) MASON TENDER-CEMENT/CONCRETE) | $23.53 | $13.15 |
| LABO0334-015 | LABORER((1) COMMON OR GENERAL) | $23.39 | $13.15 |
| LABO0334-015 | LABORER((4) GRADE CHECKER) | $23.70 | $13.15 |
| LABO0334-015 | LABORER((5) PIPELAYER) | $23.84 | $13.52 |
| LABO0334-015 | LABORER((7) LANDSCAPE) | $18.29 | $12.85 |
| LABO0499-025 | LABORER(COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER) | $32.35 | $13.45 |
| LABO0334-012 | LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTIONGROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 |
| LABO0334-012 | LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTIONGROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 |
| ENGI0326-012 | OPERATORPOWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $35.46 | $25.25 |
| ENGI0326-012 | OPERATORPOWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.32 | $25.25 |
| ENGI0326-012 | OPERATORPOWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 BACKHOE/EXCAVATOR; BORING MACHINE; BULLDOZER; GRADER/BLADE; LOADER; ROLLER; SCRAPER; TRACTOR; TRENCHER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 |
| ENGI0326-012 | OPERATORPOWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.32 | $25.25 |
| SUMI2010-058 | OPERATORCRANE | $20.00 | $5.00 |
| PAIN0022-005 | PAINTERSPRAY | $25.86 | $14.75 |
| PAIN0022-005 | PAINTERBRUSH & ROLLER | $25.06 | $14.75 |
| PLUM0333-007 | PLUMBER | $38.79 | $23.08 |
| ENGI0325-013 | POWER EQUIPMENT OPERATORUnderground Construction (Including Sewer)- GROUP 4 : BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 |
| ENGI0325-013 | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION(INCLUDING SEWER): GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 |
| ENGI0325-013 | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION(INCLUDING SEWER): GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 |
| ENGI0325-013 | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION(INCLUDING SEWER): GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 |
| SUMI2010-058 | TRUCK DRIVEROFF THE ROAD TRUCK | $20.82 | $3.69 |
| TEAM0007-008 | TRUCK DRIVERDUMP TRUCK, 8 CU. YDS. AND OVER | $33.40 | $0.75 |
| TEAM0007-008 | TRUCK DRIVERDUMP TRUCK UNDER 8 CU. YDS.; TRACTOR HAUL TRUCK FOOTNOTE: A | $470.70 | PER WEEK. B. |
| TEAM0007-008 | TRUCK DRIVERLOWBOY/SEMI-TRAILER TRUCK FOOTNOTE: A | $470.70 | PER WEEK. B. $68.70 |