Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Heavy
Covers 2 counties in Michigan: Delta, Dickinson. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BRMI0006-002 | BRICKLAYER | $34.19 | $24.65 |
| CARP1510-002 | CARPENTER, INCLUDES FORM WORK | $34.01 | $23.14 |
| PLAS0016-035 | CEMENT MASON/CONCRETE FINISHER | $20.17 | $10.13 |
| TEAM0007-010 | DAILY | $33.55 | $0.75 |
| ELEC0219-007 | ELECTRICIANELECTRICAL CONTRACTS OVER $130,000 (DICKINSON COUNTY) | $33.94 | $21.80 |
| ELEC0219-007 | ELECTRICIANELECTRICAL CONTRACTS $180,000 OR LESS (DICKINSON COUNTY) | $31.75 | $21.73 |
| ELEC0979-002 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| ELECTRICIAN(DELTA COUNTY) |
| $33.43 |
| $21.78 |
| IRON0008-009 | IRONWORKER, REINFORCING AND STRUCTURAL(CONTRACTS $10,000,000 OR GREATER) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | $41.05 | $33.67 |
| IRON0008-009 | IRONWORKER, REINFORCING AND STRUCTURAL(CONTRACTS LESS THAN $10,000,000) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | $41.05 | $33.67 |
| LABO0334-002 | LABORER((4) GRADE CHECKER) | $21.51 | $12.85 |
| LABO0334-002 | LABORER((2) MASON TENDER-CEMENT/CONCRETE) | $21.33 | $12.85 |
| LABO0334-002 | LABORER((1) COMMON OR GENERAL) | $21.19 | $12.85 |
| LABO0334-002 | LABORER((5) PIPELAYER) | $21.56 | $12.85 |
| LABO1329-002 | LABORERCOMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE (EXCLUDES UNDERGROUND CONSTRUCTION) | $32.74 | $13.45 |
| SUMI2010-045 | LABORERLANDSCAPE | $10.89 | $1.74 |
| ENGI0326-006 | OPERATORPOWER EQUIPMENT: CRANE, MAIN BOOM & JIB 120' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $43.81 | $25.00 |
| ENGI0326-006 | OPERATORPOWER EQUIPMENT: CRANE, MAIN BOOM & JIB 140' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.63 | $25.00 |
| ENGI0326-006 | OPERATORPOWER EQUIPMENT: CRANE, MAIN BOOM & JIB 220' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.92 | $25.00 |
| SUMI2010-045 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $12.98 | $6.12 |
| SUMI2010-045 | OPERATORGRADER/BLADE | $16.63 | $5.85 |
| SUMI2010-045 | OPERATORROLLER | $13.74 | $7.93 |
| ENGI0326-006 | OPERATOR POWER EQUIPMENTGROUP 2 BOOM TRUCK (NON-SWING) EXCLUDES UNDERGROUND CONSTRUCTION FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $37.26 | $25.00 |
| ENGI0326-006 | OPERATOR POWER EQUIPMENTGROUP 3 OILER EXCLUDES UNDERGROUND CONSTRUCTION FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $35.86 | $12.50 |
| ENGI0326-006 | OPERATOR POWER EQUIPMENTGROUP 1 BACKHOE/EXCAVATOR; BULLDOZER; CRANE; COMPACTOR; SCRAPER; LOADER EXCLUDES UNDERGROUND CONSTRUCTION FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $40.51 | $25.00 |
| PLUM0111-009 | PLUMBER/PIPEFITTER | $34.48 | $25.18 |
| ENGI0325-021 | POWER EQUIPMENT OPERATORUNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 |
| ENGI0325-021 | POWER EQUIPMENT OPERATORUNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 |
| ENGI0325-021 | POWER EQUIPMENT OPERATORUNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 |
| ENGI0325-021 | POWER EQUIPMENT OPERATORUNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 |
| SUMI2010-045 | TRUCK DRIVERDUMP TRUCK | $12.63 | $1.25 |
| TEAM0007-010 | TRUCK DRIVERLOWBOY/SEMI-TRAILER TRUCK FOOTNOTE: A | $470.70 | PER WEEK. B. $68.70 |