Revision 1 · modified May 18, 2026 · published May 18, 2026 · Heavy
Covers 11 counties in Michigan: Arenac, Branch, Gladwin, Hillsdale, Huron, Lenawee, Mecosta, Midland, Osceola, Shiawassee, Tuscola. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| CARP0100-005 | CARPENTER(FORM WORK ONLY) (MECOSTA & OSCEOLA COUNTIES) | $31.50 | $21.15 |
| CARP0525-008 | CARPENTERFORM WORK ONLY (BRANCH & HILLSDALE COUNTIES) | $28.29 | $21.42 |
| CARP0706-014 | CARPENTERFORM WORK ONLY (ARENAC, GLADWIN, HURON, MIDLAND & TUSCOLA COUNTIES) | $36.46 | $23.69 |
| CARP0706-018 | CARPENTERFORM WORK ONLY (SHIAWASSEE COUNTY) | $36.46 | $23.69 |
| CARP1004-013 | CARPENTERFORM WORK ONLY (LENAWEE COUNTY) | $35.41 | $21.06 |
| SUMI2010-042 | CARPENTER, EXCLUDES FORM WORK |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $23.97 |
| $6.29 |
| PLAS0016-009 | CEMENT MASON/CONCRETE FINISHER(MECOSTA & OSCEOLA COUNTIES) | $22.02 | $12.38 |
| PLAS0016-021 | CEMENT MASON/CONCRETE FINISHER(SHIAWASSEE COUNTY) | $25.58 | $12.88 |
| PLAS0016-023 | CEMENT MASON/CONCRETE FINISHER(BRANCH COUNTY) | $24.63 | $12.88 |
| PLAS0016-031 | CEMENT MASON/CONCRETE FINISHER(ARENAC, GLADWIN, HURON, MIDLAND & TUSCOLA COUNTIES) | $25.47 | $12.38 |
| PLAS0886-013 | CEMENT MASON/CONCRETE FINISHER(HILLSDALE & LENAWEE COUNTIES) | $27.19 | $16.00 |
| TEAM0007-010 | DAILY | $33.55 | $0.75 |
| ELEC0008-012 | ELECTRICIAN(HILLSDALE & LENAWEE COUNTIES) | $48.40 | $17.79 |
| ELEC0058-008 | ELECTRICIAN(HURON COUNTY) | $51.32 | $28.54 |
| ELEC0275-009 | ELECTRICIAN(MECOSTA COUNTY) | $36.52 | $25.15 |
| ELEC0275-014 | ELECTRICIAN(OSCEOLA COUNTY (TOWNSHIPS OF RICHMOND, HERSEY, EVART & ORIENT)) | $36.52 | $25.15 |
| ELEC0445-008 | ELECTRICIAN(BRANCH COUNTY) | $41.00 | $25.74 |
| ELEC0498-012 | ELECTRICIAN(OSCEOLA COUNTY (DOES NOT INCLUDE THE TOWNSHIPS OF EVART, HERSEY, ORIENT AND RICHMOND)) | $36.62 | $23.05 |
| ELEC0557-008 | ELECTRICIAN(MIDLAND (TOWNSHIPS OF INGERSOLL, JASPER, MOUNT HALEY AND PORTER) & TUSCOLA (TOWNSHIPS OF ALMER, ARBELA, COLUMBIA, DAYTON, DENMARK, ELKLAND, ELLINGTON, ELMWOOD, FAIRGROVE, FREMONT, GILFORD, INDIANFIELDS, JUNIATA, KINGSTON, KOYLON, NOVESTA, TUSCOLA, VASSAR, WATERTOWN AND WELLS) COUNTIES) | $40.00 | $29.95 |
| ELEC0665-018 | ELECTRICIAN(SHIAWASSEE COUNTY (TOWNSHIPS OF PERRY & WOODHULL)) | $45.00 | $31.37 |
| ELEC0692-017 | ELECTRICIAN(ARENAC & GLADWIN COUNTIES) | $40.00 | $26.52 |
| ELEC0692-018 | ELECTRICIAN(MIDLAND (ALL TOWNSHIPS EXCEPT MOUNT HALEY, JASPER, PORTER & INGERSOLL) & TUSCOLA (TOWNSHIPS OF WISNER & AKRON) COUNTIES) | $35.31 | $22.68 |
| ELEC0948-008 | ELECTRICIAN(SHIAWASSEE (ALL TOWNSHIPS EXCEPT PERRY & WOODHULL) & TUSCOLA (TOWNSHIP OF MILLINGTON) COUNTIES) | $44.83 | $26.96 |
| IRON0025-007 | IRONWORKERREINFORCING (ARENAC, GLADWIN, HURON, MIDLAND, SHIAWASSEE & TUSCOLA COUNTIES) | $36.55 | $33.37 |
| IRON0025-007 | IRONWORKERSTRUCTURAL (ARENAC, GLADWIN, HURON, MIDLAND, SHIAWASSEE & TUSCOLA COUNTIES) | $36.55 | $35.93 |
| IRON0025-016 | IRONWORKERREINFORCING (BRANCH, HILLSDALE, MECOSTA & OSCEOLA COUNTIES) | $36.55 | $34.04 |
| IRON0025-016 | IRONWORKERSTRUCTURAL (BRANCH, HILLSDALE, MECOSTA & OSCEOLA COUNTIES) | $36.55 | $34.04 |
| IRON0055-011 | IRONWORKER, STRUCTURAL AND REINFORCING(LENAWEE COUNTY) | $35.50 | $29.20 |
| LABO0334-008 | LABORER(4) GRADE CHECKER (ARENAC, BRANCH, GLADWIN, HURON, MECOSTA, MIDLAND, OSCEOLA, TUSCOLA) | $22.73 | $12.95 |
| LABO0334-008 | LABORER(1) COMMON OR GENERAL (ARENAC, BRANCH, GLADWIN, HURON, MECOSTA, MIDLAND, OSCEOLA, TUSCOLA) | $22.42 | $12.95 |
| LABO0334-019 | LABORER(1) COMMON OR GENERAL (HILLSDALE, LENAWEE, SHIAWASSEE) | $23.39 | $13.15 |
| LABO0334-019 | LABORER(4) GRADE CHECKER (HILLSDALE, LENAWEE, SHIAWASSEE) | $23.70 | $13.15 |
| LABO0355-007 | LABORERCOMMON OR GENERAL (BRANCH COUNTY) (EXCLUDES OPEN CUT CONSTRUCTION) | $27.21 | $13.45 |
| LABO0355-015 | LABORERCOMMON OR GENERAL (MECOSTA & OSCEOLA COUNTIES) (EXCLUDES OPEN CUT CONSTRUCTION) | $26.70 | $12.95 |
| LABO0499-014 | LABORERCOMMON OR GENERAL (HILLSDALE & LENAWEE COUNTIES) (EXCLUDES OPEN CUT CONSTRUCTION) | $32.35 | $13.45 |
| LABO1075-011 | LABORERCOMMON OR GENERAL (SHIAWASSEE COUNTY) (EXCLUDES OPEN CUT CONSTRUCTION) | $29.46 | $16.11 |
| LABO1098-022 | LABORERCOMMON OR GENERAL (ARENAC, GLADWIN, HURON, MIDLAND & TUSCOLA COUNTIES) EXCLUDES OPEN CUT CONSTRUCTION | $27.68 | $13.45 |
| SUMI2010-042 | LABORERPIPELAYER | $15.28 | $3.99 |
| SUMI2010-042 | LABORERMASON TENDER - CEMENT/CONCRETE | $15.97 | $3.51 |
| SUMI2010-042 | LABORERLANDSCAPE | $10.89 | $1.74 |
| ENGI0326-014 | OPERATING ENGINEERGROUP 1 (AREA 1) | $48.98 | $25.25 |
| ENGI0326-014 | OPERATING ENGINEERGROUP 4 (AREA 1) | $41.32 | $25.25 |
| ENGI0326-014 | OPERATING ENGINEERGROUP 5 (AREA 1) | $32.98 | $25.25 |
| ENGI0326-014 | OPERATING ENGINEERGROUP 3 (AREA 1) | $44.00 | $25.25 |
| ENGI0326-014 | OPERATING ENGINEERGROUP 2 (AREA 1) | $45.68 | $25.25 |
| ENGI0326-014 | OPERATING ENGINEERSGROUP 3 (AREA 2) | $44.00 | $25.25 |
| ENGI0326-014 | OPERATING ENGINEERSGROUP 2 (AREA 2) | $45.68 | $25.25 |
| ENGI0326-014 | OPERATING ENGINEERSGROUP 1 (AREA 2) | $48.98 | $25.25 |
| ENGI0326-014 | OPERATING ENGINEERSGROUP 4 (AREA 2) | $41.32 | $25.25 |
| ENGI0326-014 | OPERATING ENGINEERSGROUP 5 (AREA 2) | $32.98 | $25.25 |
| ENGI0326-024 | OPERATORPOWER EQUIPMENT: GROUP 2 CRANE WITH BOOM & JIB OR LEADS 300' OR LONGER (LENAWEE COUNTY) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $48.79 | $25.35 |
| ENGI0326-024 | OPERATORPOWER EQUIPMENT: GROUP 1 (LENAWEE COUNTY) CRANE WITH BOOM & JIB OR LEADS 400' OR LONGER (LENAWEE COUNTY) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $51.29 | $25.35 |
| ENGI0326-024 | OPERATORPOWER EQUIPMENT: GROUP 3 CRANE WITH BOOM & JIB OR LEADS 220' OR LONGER (LENAWEE COUNTY) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $48.29 | $25.35 |
| ENGI0326-024 | OPERATORPOWER EQUIPMENT: GROUP 4CRANE WITH BOOM & JIB OR LEADS 140' OR LONGER (LENAWEE COUNTY) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $47.99 | $25.35 |
| ENGI0326-024 | OPERATORPOWER EQUIPMENT: GROUP 5 CRANE WITH BOOM & JIB OR LEADS 120' OR LONGER (LENAWEE COUNTY) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $47.17 | $25.35 |
| ENGI0326-024 | OPERATORPOWER EQUIPMENT: GROUP 6 REGULAR CRANE OPERATOR (LENAWEE COUNTY) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $46.31 | $25.35 |
| ENGI0326-024 | OPERATORPOWER EQUIPMENT: GROUP 7 BACKHOE/EXCAVATOR, BULLDOZER, COMPACTOR, SCRAPER, LOADER (LENAWEE COUNTY) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $45.34 | $25.35 |
| ENGI0326-024 | OPERATORPOWER EQUIPMENT: GROUP 8 OILER (LENAWEE COUNTY) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $35.29 | $25.35 |
| SUMI2010-042 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $12.98 | $6.12 |
| SUMI2010-042 | OPERATORGRADER/BLADE | $15.50 | $3.62 |
| SUMI2010-042 | OPERATORROLLER | $13.74 | $7.93 |
| PLUM0636-008 | PIPEFITTER(HURON COUNTY (EAST OF M-53)) | $40.41 | $29.35 |
| PLUM0098-008 | PLUMBER(HURON COUNTY (EAST OF M-53)) | $35.77 | $35.13 |
| PLUM0085-017 | PLUMBER/PIPEFITTER(ARENAC, GLADWIN, HURON (WEST OF M-53), MIDLAND & TUSCOLA COUNTIES) | $43.50 | $22.10 |
| PLUM0174-015 | PLUMBER/PIPEFITTER(MECOSTA & OSCEOLA COUNTIES) | $39.89 | $23.82 |
| PLUM0190-012 | PLUMBER/PIPEFITTER(LENAWEE COUNTY (TOWNSHIPS OF CLINTON, MACON & TECUMSEH)) | $44.31 | $23.70 |
| PLUM0333-021 | PLUMBER/PIPEFITTER(BRANCH & HILLSDALE COUNTIES) | $42.29 | $23.94 |
| PLUM0333-022 | PLUMBER/PIPEFITTER(LENAWEE COUNTY (REMAINDER OF COUNTY)) | $42.29 | $23.94 |
| PLUM0370-007 | PLUMBER/PIPEFITTER(SHIAWASSEE COUNTY) | $39.81 | $20.95 |
| ENGI0325-021 | POWER EQUIPMENT OPERATORUNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 |
| ENGI0325-021 | POWER EQUIPMENT OPERATORUNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 |
| ENGI0325-021 | POWER EQUIPMENT OPERATORUNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 |
| ENGI0325-021 | POWER EQUIPMENT OPERATORUNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 |
| SUMI2010-042 | TRUCK DRIVERDUMP TRUCK | $14.06 | $1.25 |
| TEAM0007-010 | TRUCK DRIVERLOWBOY/SEMI-TRAILER TRUCK FOOTNOTE: A | $470.70 | PER WEEK. B. $68.70 |