Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Heavy
Covers 9 counties in Michigan: Alpena, Crawford, Iosco, Montmorency, Ogemaw, Oscoda, Otsego, Presque Isle, Roscommon. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| CARP0202-004 | CARPENTER, INCLUDES FORM WORK(ALL OTHER COUNTIES) | $30.83 | $21.09 |
| CARP0706-015 | CARPENTER, INCLUDES FORM WORK(IOSCO & OGEMAW COUNTIES) | $35.86 | $23.69 |
| PLAS0016-032 | CEMENT MASON/CONCRETE FINISHER(IOSCO & OGEMAW COUNTIES) | $25.47 | $12.38 |
| PLAS0016-034 | CEMENT MASON/CONCRETE FINISHER(ALPENA, CRAWFORD, MONTMORENCY, OSCODA, OTSEGO, PRESQUE ISLE & ROSCOMMON COUNTIES) | $23.10 | $12.38 |
| TEAM0007-010 | DAILY | $33.55 | $0.75 |
| ELEC0498-010 | ELECTRICIAN(CRAWFORD (DOES NOT INCLUDE THE TOWNSHIP OF LOVELLS), OTSEGO (DOES NOT INCLUDE THE TOWNSHIPS OF CHARLTON, CHESTER AND DOVER) & ROSCOMMON (DOES NOT INCLUDE THE TOWNSHIPS OF BACKUS, NESTOR AND ROSCOMMON) COUNTIES) |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $36.62 |
| $23.05 |
| ELEC0692-009 | ELECTRICIAN(ALPENA, CRAWFORD (TOWNSHIP OF LOVELLS); IOSCO (TOWNSHIPS OF AUSABLE, OSCODA, PLAINFIELD & WILBUR), MONTMORENCY, OGEMAW (TOWNSHIPS OF FOSTER, ROSE & GOODAR), OSCODA, OTSEGO (TOWNSHIPS OF CHARLTON, CHESTER AND DOVER) & PRESQUE ISLE COUNTIES) | $37.75 | $25.60 |
| ELEC0692-019 | ELECTRICIAN(IOSCO (TOWNSHIPS OF ALABASTER, BALDWIN, BURLEIGH, GRANT, RENO, SHERMAN & TAWAS), OGEMAW (ALL TOWNSHIPS EXCEPT FOSTER, GOODAR & ROSE) & ROSCOMMON (TOWNSHIPS OF BACKUS, NESTOR AND ROSCOMMON) COUNTIES) | $40.00 | $26.52 |
| IRON0025-006 | IRONWORKERSTRUCTURAL | $36.55 | $35.93 |
| IRON0025-006 | IRONWORKERREINFORCING | $36.55 | $33.37 |
| LABO0334-025 | LABORER((4) GRADE CHECKER) | $22.73 | $12.95 |
| LABO0334-025 | LABORER((1) COMMON OR GENERAL) | $22.42 | $12.95 |
| LABO1098-008 | LABORERCOMMON 3.323OR GENERAL (ALPENA, CRAWFORD, IOSCO, MONTMORENCY, OSCODA, OTSEGO & PRESQUE ISLE COUNTIES) (EXCLUDES OPEN CUT CONSTRUCTION) | $23.32 | $13.45 |
| LABO1098-008 | LABORERCOMMON OR GENERAL (ALPENA, CRAWFORD, IOSCO, MONTMORENCY, OSCODA, OTSEGO & PRESQUE ISLE COUNTIES) (EXCLUDES OPEN CUT CONSTRUCTION) | $25.02 | $13.45 |
| LABO1098-020 | LABORERCOMMON OR GENERAL (OGEMAW & ROSCOMMON COUNTIES) (EXCLUDES OPEN CUT CONSTRUCTION) | $27.68 | $13.45 |
| SUMI2010-040 | LABORERLANDSCAPE | $10.89 | $1.74 |
| SUMI2010-040 | LABORERPIPELAYER | $15.28 | $3.99 |
| SUMI2010-040 | LABORERMASON TENDER - CEMENT/CONCRETE | $15.97 | $3.51 |
| ENGI0326-013 | OPERATORPOWER EQUIPMENT:EXCLUDES UNDERGROUND CONSTRUCTION GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; COMPACTOR; CRANE; SCRAPER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 |
| ENGI0326-013 | OPERATORPOWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 5 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $32.98 | $25.25 |
| ENGI0326-013 | OPERATORPOWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $48.98 | $25.25 |
| ENGI0326-013 | OPERATORPOWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 4 BOOM TRUCK (NON-SWINGING) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.32 | $25.25 |
| ENGI0326-013 | OPERATORPOWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $45.68 | $25.25 |
| SUMI2010-040 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $12.98 | $6.12 |
| SUMI2010-040 | OPERATORROLLER | $13.74 | $7.93 |
| SUMI2010-040 | OPERATORLOADER | $16.07 | $8.37 |
| SUMI2010-040 | OPERATORGRADER/BLADE | $15.50 | $3.62 |
| PLUM0085-002 | PLUMBER | $43.50 | $21.10 |
| ENGI0325-021 | POWER EQUIPMENT OPERATORUNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 |
| ENGI0325-021 | POWER EQUIPMENT OPERATORUNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 |
| ENGI0325-021 | POWER EQUIPMENT OPERATORUNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 |
| ENGI0325-021 | POWER EQUIPMENT OPERATORUNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 |
| SUMI2010-040 | TRUCK DRIVERDUMP TRUCK | $11.10 | $1.25 |
| TEAM0007-010 | TRUCK DRIVERLOWBOY/SEMI-TRAILER TRUCK FOOTNOTE: A | $470.70 | PER WEEK. B. $68.70 |