Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Heavy
Covers 1 county in Michigan: Isabella. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| CARP0706-007 | CARPENTER(FORM WORK ONLY) | $33.11 | $23.64 |
| SUMI2010-037 | CARPENTER, EXCLUDES FORM WORK | $23.97 | $6.29 |
| PLAS0016-030 | CEMENT MASON/CONCRETE FINISHER | $25.47 | $12.38 |
| TEAM0007-010 | DAILY | $33.55 | $0.75 |
| ELEC0275-004 | ELECTRICIAN(TOWNSHIPS OF BLOOMFIELD, COLDWATER, DEERFIELD, FREMONT, GILMORE, NOTTAWA, ROLLAND & SHERMAN) | $36.52 | $25.15 |
| ELEC0557-010 | ELECTRICIAN(TOWNSHIPS OF LINCOLN & COE) | $40.00 | $29.95 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| ELEC0692-016 | ELECTRICIAN(TOWNSHIPS OF CHIPPEWA, DENVER, ISABELLA, UNION, VERNON & WISE) | $40.00 | $26.52 |
| IRON0025-006 | IRONWORKERSTRUCTURAL | $36.55 | $35.93 |
| IRON0025-006 | IRONWORKERREINFORCING | $36.55 | $33.37 |
| LABO0334-003 | LABORER((4) GRADE CHECKER) | $22.73 | $12.95 |
| SUMI2010-037 | LABORERMASON TENDER - CEMENT/CONCRETE | $15.97 | $3.51 |
| SUMI2010-037 | LABORERLANDSCAPE | $10.89 | $1.74 |
| SUMI2010-037 | LABORERCOMMON OR GENERAL | $19.79 | $5.95 |
| SUMI2010-037 | LABORERPIPELAYER | $15.28 | $3.99 |
| ENGI0326-021 | OPERATORPOWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; COMPACTOR; CRANE; SCRAPER; LOADER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 |
| ENGI0326-021 | OPERATORPOWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 4 BOOM TRUCK (NON-SWINGING) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.32 | $25.25 |
| ENGI0326-021 | OPERATORPOWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $45.68 | $25.25 |
| ENGI0326-021 | OPERATORPOWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 5 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $32.98 | $25.25 |
| ENGI0326-021 | OPERATORPOWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $48.98 | $25.25 |
| SUMI2010-037 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $12.98 | $6.12 |
| SUMI2010-037 | OPERATORROLLER | $13.74 | $7.93 |
| SUMI2010-037 | OPERATORGRADER/BLADE | $15.50 | $3.62 |
| PLUM0085-011 | PLUMBER/PIPEFITTER | $43.50 | $22.10 |
| ENGI0325-021 | POWER EQUIPMENT OPERATORUNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 |
| ENGI0325-021 | POWER EQUIPMENT OPERATORUNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 |
| ENGI0325-021 | POWER EQUIPMENT OPERATORUNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 |
| ENGI0325-021 | POWER EQUIPMENT OPERATORUNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 |
| SUMI2010-037 | TRUCK DRIVERDUMP TRUCK | $14.06 | $1.25 |
| TEAM0007-010 | TRUCK DRIVERLOWBOY/SEMI-TRAILER TRUCK FOOTNOTE: A | $470.70 | PER WEEK. B. $68.70 |