Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Heavy
Covers 1 county in Michigan: Emmet. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| CARP0202-003 | CARPENTER, INCLUDES FORM WORK | $30.83 | $21.09 |
| PLAS0016-033 | CEMENT MASON/CONCRETE FINISHER | $23.10 | $12.38 |
| TEAM0007-010 | DAILY | $33.55 | $0.75 |
| ELEC0498-011 | ELECTRICIAN(EXCLUDING THE TOWNSHIP OF WAWATAN) | $36.62 | $23.05 |
| ELEC0692-022 | ELECTRICIAN(TOWNSHIP OF WAWATAN) | $37.75 | $25.60 |
| IRON0025-011 | IRONWORKERREINFORCING | $36.55 | $34.04 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| IRON0025-011 |
| IRONWORKERSTRUCTURAL |
| $36.55 |
| $34.04 |
| LABO0334-003 | LABORER((4) GRADE CHECKER) | $22.73 | $12.95 |
| SUMI2010-033 | LABORERCOMMON OR GENERAL | $13.13 | $6.75 |
| SUMI2010-033 | LABORERLANDSCAPE | $10.89 | $1.74 |
| SUMI2010-033 | LABORERMASON TENDER - CEMENT/CONCRETE | $15.97 | $3.51 |
| SUMI2010-033 | LABORERPIPELAYER | $15.28 | $3.99 |
| ENGI0326-017 | OPERATORPOWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $48.98 | $25.25 |
| ENGI0326-017 | OPERATORPOWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 4 BOOM TRUCK (NON-SWINGING) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.32 | $25.25 |
| ENGI0326-017 | OPERATORPOWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $45.68 | $25.25 |
| ENGI0326-017 | OPERATORPOWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 3 COMPACTOR; CRANE; SCRAPER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 |
| ENGI0326-017 | OPERATORPOWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 5 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $32.98 | $25.25 |
| SUMI2010-033 | OPERATORBACKHOE/EXCAVATOR | $14.24 | $8.11 |
| SUMI2010-033 | OPERATORROLLER | $13.74 | $7.93 |
| SUMI2010-033 | OPERATORGRADER/BLADE | $15.50 | $3.62 |
| SUMI2010-033 | OPERATORLOADER | $13.26 | $8.36 |
| SUMI2010-033 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $12.98 | $6.12 |
| SUMI2010-033 | OPERATORBULLDOZER | $16.17 | $9.51 |
| SUMI2010-033 | PLUMBER | $17.53 | $4.17 |
| ENGI0325-026 | POWER EQUIPMENT OPERATORUNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BORING MACHINE, CRANE, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 |
| ENGI0325-026 | POWER EQUIPMENT OPERATORUNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 |
| ENGI0325-026 | POWER EQUIPMENT OPERATORUNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 |
| ENGI0325-026 | POWER EQUIPMENT OPERATORUNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 |
| SUMI2010-033 | TRUCK DRIVERDUMP TRUCK | $12.63 | $1.25 |
| TEAM0007-010 | TRUCK DRIVERLOWBOY/SEMI-TRAILER TRUCK FOOTNOTE: A | $470.70 | PER WEEK. B. $68.70 |