ELECTRICIAN(TOWNSHIPS OF DORR, FILLMORE, LAKETON, LEIGHTON, OVERISEL & SALEM)
$36.52
$25.15
IRON0025-011
IRONWORKERSTRUCTURAL
$36.55
$34.04
IRON0025-011
IRONWORKERREINFORCING
$36.55
$34.04
LABO0334-025
LABORER((1) COMMON OR GENERAL)
$22.42
$12.95
LABO0334-025
LABORER((4) GRADE CHECKER)
$22.73
$12.95
LABO0355-008
LABORERCOMMON OR GENERAL (EXCLUDES OPEN CUT CONSTRUCTION)
$27.21
$13.45
SUMI2010-029
LABORERPIPELAYER
$15.28
$3.99
SUMI2010-029
LABORERMASON TENDER - CEMENT/CONCRETE
$15.97
$3.51
SUMI2010-029
LABORERLANDSCAPE
$10.89
$1.74
ENGI0326-015
OPERATORPOWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 4 BOOM TRUCK (NON-SWINGING) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$41.32
$25.25
ENGI0326-015
OPERATORPOWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 3 BACKHOE/EXCAVATOR; COMPACTOR; CRANE; SCRAPER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$44.00
$25.25
ENGI0326-015
OPERATORPOWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 5 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$32.98
$25.25
ENGI0326-015
OPERATORPOWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$45.68
$25.25
ENGI0326-015
OPERATORPOWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$48.98
$25.25
SUMI2010-029
OPERATORBULLDOZER
$13.50
$1.55
SUMI2010-029
OPERATORROLLER
$13.74
$7.93
SUMI2010-029
OPERATORLOADER
$13.50
$1.55
SUMI2010-029
OPERATORGRADER/BLADE
$15.50
$3.62
SUMI2010-029
OPERATORBOBCAT/SKID STEER/SKID LOADER
$12.98
$6.12
PLUM0174-017
PLUMBER/PIPEFITTER(TOWNSHIPS OF DORR, FILLMORE, LAKETOWN, LEIGHTON, OVERISEL & SALEM)
$39.89
$23.82
PLUM0357-015
PLUMBER/PIPEFITTER(REMAINDER OF COUNTY)
$35.20
$22.35
ENGI0325-023
POWER EQUIPMENT OPERATORUNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM)
$40.52
$25.25
ENGI0325-023
POWER EQUIPMENT OPERATORUNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR
$39.95
$25.25
ENGI0325-023
POWER EQUIPMENT OPERATORUNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, CRANE, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY)
$45.98
$25.25
ENGI0325-023
POWER EQUIPMENT OPERATORUNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER)