Pulling the wage determination…
Revision 2 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 2 counties in Michigan: Berrien, Cass. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUMI2010-024 | CARPENTER | $18.81 | $6.38 |
| SUMI2010-024 | CEMENT MASON/CONCRETE FINISHER | $19.27 | $5.85 |
| ELEC0153-005 | ELECTRICIAN | $27.00 | $18.29 |
| IRON0292-007 | IRONWORKER, STRUCTURAL | $31.75 | $22.84 |
| LABO0355-002 | LABORERMASON TENDER - CEMENT/CONCRETE | $27.21 | $13.45 |
| SUMI2010-024 | LABORERPIPELAYER | $17.95 | $5.46 |
| SUMI2010-024 | LABORER |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $16.87 |
| $5.46 |
| SUMI2010-024 | LABORERLANDSCAPE | $9.64 | $2.81 |
| ENGI0325-005 | OPERATORPOWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $45.68 | $25.25 |
| ENGI0325-005 | OPERATORPOWER EQUIPMENT: GROUP 3 BULLDOZER; CRANE; GRADER/BLADE; LOADER; SCRAPER; STIFF LEG DERRICK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 |
| ENGI0325-005 | OPERATORPOWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $48.98 | $25.25 |
| SUMI2010-024 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $17.66 | $7.65 |
| SUMI2010-024 | OPERATORBACKHOE/EXCAVATOR | $19.94 | $5.46 |
| PAIN0312-011 | PAINTERBRUSH AND ROLLER | $21.75 | $11.94 |
| PLUM0172-005 | PIPEFITTERHVAC PIPE INSTALLATION ONLY (BERRIEN (CITY OF NILES & VICINITY) & CASS COUNTIES) | $20.96 | $19.18 |
| SUMI2010-024 | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $26.17 | $7.55 |
| ROOF0023-009 | ROOFER(SLATE & TILE) | $36.05 | $21.04 |
| ROOF0023-009 | ROOFERCOMPOSITION | $34.55 | $21.04 |
| SHEE0020-030 | SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $44.45 | $30.43 |
| SUMI2010-024 | TRUCK DRIVERDUMP TRUCK | $17.00 | $5.71 |