Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 1 county in Michigan: Washtenaw. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0025-005 | ASBESTOS WORKER/HEAT & FROST INSULATOR(TOWNSHIPS OF ANN ARBOR, AUGUSTA, LODI, NORTHFIELD, PITTSFIELD, SALEM, SALINE, SCIO, SUPERIOR, WEBSTER, YPSILANTI & YORK) | $40.74 | $32.59 |
| ASBE0047-004 | ASBESTOS WORKER/HEAT & FROST INSULATOR(TOWNSHIPS OF BRIDGEWATER, DEXTER, FREEDOM, LIMS, LYNDON, MANCHESTER, SHARON & SYLVAN) | $40.00 | $23.65 |
| CARP1234-003 | CARPENTER(MULTI-FAMILY CONDOMINIUMS) | $31.58 | $16.27 |
| CARP1234-003 | CARPENTER(SINGLE-FAMILY HOMES AND DETATCHED CONDOMINIUMS) | $29.19 | $15.76 |
| SUMI2010-022 | CEMENT MASON/CONCRETE FINISHER | $19.27 | $5.85 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| TEAM0247-003 |
| DAY |
| $31.03 |
| $0.70 |
| ELEC0252-005 | ELECTRICIAN | $39.26 | $20.35 |
| IRON0025-004 | IRONWORKER, STRUCTURAL | $36.55 | $35.93 |
| LABO0499-016 | LABORERMASON TENDER - CEMENT/CONCRETE | $38.33 | $15.45 |
| SUMI2010-022 | LABORERPIPELAYER | $17.99 | $5.46 |
| SUMI2010-022 | LABORERCOMMON OR GENERAL | $15.58 | $5.46 |
| LABO0334-020 | LANDSCAPE LABORERGROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 |
| LABO0334-020 | LANDSCAPE LABORERGROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 |
| ENGI0325-004 | OPERATORPOWER EQUIPMENT: GROUP 6 REGULAR CRANE OPERATOR FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL | $46.31 | $25.35 |
| ENGI0325-004 | OPERATORPOWER EQUIPMENT: GROUP 5 CRANE WITH BOOM AND JIB OR LEADS 120' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL | $47.17 | $25.35 |
| ENGI0325-004 | OPERATORPOWER EQUIPMENT: GROUP 4 CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL | $47.99 | $25.35 |
| ENGI0325-004 | OPERATORPOWER EQUIPMENT: GROUP 3 CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL | $48.29 | $25.35 |
| ENGI0325-004 | OPERATORPOWER EQUIPMENT: GROUP 2 CRANE WITH BOOM AND JIB OR LEADS 300' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL | $49.79 | $25.35 |
| ENGI0325-004 | OPERATORPOWER EQUIPMENT: GROUP 1 CRANE WITH BOOM AND JIB OR LEADS 400' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL | $51.29 | $25.35 |
| ENGI0325-004 | OPERATORPOWER EQUIPMENT: GROUP 7 BACKHOE/EXCAVATOR; BOBCAT/SKID LOADER; BULLDOZER; GRADER/BLADE; SCRAPER; LOADER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL | $45.34 | $25.35 |
| PAIN0022-004 | PAINTERBRUSH AND ROLLER | $20.14 | $14.72 |
| PLUM0190-007 | PIPEFITTER(HVAC PIPE INSTALLATION ONLY) | $44.31 | $23.70 |
| PLUM0190-007 | PLUMBER(EXCLUDING HVAC PIPE INSTALLATION) | $42.26 | $23.70 |
| ROOF0070-008 | ROOFER | $42.67 | $21.62 |
| SHEE0080-002 | SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $28.67 | $9.50 |
| SUMI2010-022 | TRUCK DRIVERDUMP TRUCK | $17.00 | $5.71 |
| TEAM0247-003 | TRUCK DRIVERPICKUP PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. IF ANY OF THE ABOVE HOLIDAYS FALL ON A SUNDAY, THE FOLLOWING MONDAY SHALL BE CONSIDERED THE HOLIDAY AND, IF WORK IS PERFORMED, THE RATE SHALL BE DOUBLE TIME. FOOTNOTE: A | $456.70 | PER WEEK, PLUS $67.10 PER |