Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 1 county in Michigan: Van Buren. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUMI2010-021 | CARPENTER | $18.81 | $6.38 |
| SUMI2010-021 | CEMENT MASON/CONCRETE FINISHER | $19.27 | $5.85 |
| SUMI2010-021 | ELECTRICIAN | $18.44 | $3.51 |
| IRON0025-014 | IRONWORKER, STRUCTURAL | $36.55 | $29.51 |
| LABO0355-002 | LABORERMASON TENDER - CEMENT/CONCRETE | $27.21 | $13.45 |
| SUMI2010-021 | LABORERPIPELAYER | $17.95 | $5.46 |
| SUMI2010-021 | LABORER |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $9.64 |
| $2.81 |
| SUMI2010-021 | LABORERCOMMON OR GENERAL | $16.87 | $5.46 |
| ENGI0325-005 | OPERATORPOWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $48.98 | $25.25 |
| ENGI0325-005 | OPERATORPOWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $45.68 | $25.25 |
| ENGI0325-005 | OPERATORPOWER EQUIPMENT: GROUP 3 BULLDOZER; CRANE; GRADER/BLADE; LOADER; SCRAPER; STIFF LEG DERRICK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 |
| SUMI2010-021 | OPERATORBACKHOE/EXCAVATOR | $19.94 | $5.46 |
| SUMI2010-021 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $17.66 | $7.65 |
| PAIN0312-011 | PAINTERBRUSH AND ROLLER | $21.75 | $11.94 |
| PLUM0357-004 | PIPEFITTER(HVAC PIPE INSTALLATION ONLY) | $27.18 | $21.05 |
| SUMI2010-021 | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $24.71 | $5.04 |
| ROOF0070-016 | ROOFER | $33.98 | $18.51 |
| SHEE0007-023 | SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $32.00 | $10.73 |
| SUMI2010-021 | TRUCK DRIVERDUMP TRUCK | $17.00 | $5.71 |