Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 1 county in Michigan: Saginaw. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUMI2010-019 | CARPENTER | $20.11 | $9.50 |
| SUMI2010-019 | CEMENT MASON/CONCRETE FINISHER | $19.27 | $5.85 |
| ELEC0557-006 | ELECTRICIAN | $37.00 | $23.13 |
| IRON0025-004 | IRONWORKER, STRUCTURAL | $36.55 | $35.93 |
| LABO1098-002 | LABORERCOMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE | $27.68 | $13.45 |
| SUMI2010-019 | LABORERLANDSCAPE | $9.64 | $2.81 |
| SUMI2010-019 | LABORER |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $17.95 |
| $5.46 |
| ENGI0325-022 | OPERATORPOWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; CRANE; GRADER/BLADE; LOADER; SCRAPER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 |
| ENGI0325-022 | OPERATORPOWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $48.98 | $25.25 |
| ENGI0325-022 | OPERATORPOWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $45.68 | $25.25 |
| SUMI2010-019 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $17.66 | $7.65 |
| PAIN1803-014 | PAINTERBRUSH AND ROLLER | $21.83 | $12.80 |
| PLUM0085-016 | PIPEFITTER(HVAC PIPE INSTALLATION ONLY) | $30.45 | $10.64 |
| PLUM0085-016 | PLUMBER(EXCLUDING HVAC PIPE INSTALLATION) | $30.45 | $10.64 |
| ROOF0149-019 | ROOFER | $30.38 | $19.87 |
| SHEE0007-031 | SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $21.54 | $11.91 |
| SUMI2010-019 | TRUCK DRIVERDUMP TRUCK | $17.00 | $5.71 |