Pulling the wage determination…
Revision 2 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 1 county in Michigan: Genesee. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| CARP0706-012 | CARPENTER | $36.46 | $23.69 |
| SUMI2010-011 | CEMENT MASON/CONCRETE FINISHER | $19.27 | $5.85 |
| ELEC0948-002 | ELECTRICIAN | $35.62 | $13.70 |
| IRON0025-004 | IRONWORKER, STRUCTURAL | $36.55 | $35.93 |
| LABO1075-001 | LABORERCOMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE | $29.46 | $16.10 |
| SUMI2010-011 | LABORERPIPELAYER | $17.99 | $5.46 |
| LABO0334-020 | LANDSCAPE LABORER |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $29.93 |
| $9.10 |
| LABO0334-020 | LANDSCAPE LABORERGROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 |
| ENGI0325-030 | OPERATORPOWER EQUIPMENT: GROUP 4 BOBCAT/ SKID LOADER FOOTNOTES: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.32 | $25.25 |
| ENGI0325-030 | OPERATORPOWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $45.68 | $25.25 |
| ENGI0325-030 | OPERATORPOWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; CRANE; GRADER/BLADE; LOADER; AND SCRAPER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 |
| ENGI0325-030 | OPERATORPOWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $48.98 | $25.25 |
| PAIN1052-006 | PAINTERBRUSH AND ROLLER | $22.25 | $11.10 |
| PLUM0370-001 | PIPEFITTER(HVAC PIPE INSTALLATION ONLY) | $26.46 | $20.60 |
| PLUM0370-001 | PLUMBER(EXCLUDING HVAC PIPE INSTALLATION) | $26.46 | $20.60 |
| ROOF0149-019 | ROOFER | $30.38 | $19.87 |
| SHEE0007-002 | SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $24.88 | $8.76 |
| SUMI2010-011 | TRUCK DRIVERDUMP TRUCK | $17.00 | $5.71 |