Pulling the wage determination…
Revision 2 · modified May 18, 2026 · published May 18, 2026 · Highway
Covers 1 county in Maine: Penobscot. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUME2014-042 | CARPENTER, INCLUDES FORM WORK | $18.95 | $3.23 |
| SUME2014-042 | CEMENT MASON/CONCRETE FINISHER | $19.27 | $1.13 |
| SUME2014-042 | ELECTRICIAN | $25.78 | $6.83 |
| SUME2014-042 | IRONWORKER, REINFORCING | $21.85 | $0.00 |
| SUME2014-042 | IRONWORKER, STRUCTURAL | $22.33 | $4.50 |
| SUME2014-042 | LABORERCOMMON OR GENERAL | $12.83 | $2.20 |
| SUME2014-042 | LABORERASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $17.08 |
| $2.48 |
| SUME2014-042 | LABORERLANDSCAPE | $17.03 | $2.81 |
| SUME2014-042 | OPERATORMILLING MACHINE | $26.83 | $7.05 |
| SUME2014-042 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $16.33 | $2.78 |
| SUME2014-042 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $19.26 | $5.57 |
| SUME2014-042 | OPERATORBROOM/SWEEPER | $18.77 | $0.00 |
| SUME2014-042 | OPERATORBULLDOZER | $21.71 | $5.67 |
| SUME2014-042 | OPERATORLOADER | $18.94 | $7.66 |
| SUME2014-042 | OPERATORROLLER (EARTH) | $17.61 | $2.97 |
| ENGI0004-004 | POWER EQUIPMENT OPERATORGRADER/BLADE, MECHANIC, PAVER (ASPHALT, AGGREGATE, AND CONCRETE), ROLLER ASPHALT | $30.17 | $13.80 |
| SUME2014-042 | TRAFFIC CONTROLFLAGGER | $9.00 | $0.00 |
| SUME2014-042 | TRAFFIC CONTROLLABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.02 | $5.37 |
| SUME2014-042 | TRUCK DRIVERDUMP TRUCK | $14.56 | $6.32 |
| TEAM0340-003 | TRUCK DRIVERVACUUM TRUCK | $25.65 | $17.69 |