Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Highway
Covers 1 county in Maine: Piscataquis. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUME2014-036 | CARPENTER, INCLUDES FORM WORK | $18.34 | $2.84 |
| SUME2014-036 | HIGHWAY/PARKING LOT STRIPINGLABORER | $15.81 | $3.24 |
| SUME2014-036 | IRONWORKER, REINFORCING | $16.27 | $0.00 |
| SUME2014-036 | LABORERASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $14.32 | $3.17 |
| SUME2014-036 | LABORERCOMMON OR GENERAL | $13.46 | $1.38 |
| SUME2014-036 | LABORERWHEELMAN | $15.40 | $3.01 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| SUME2014-036 | OPERATORMECHANIC | $22.30 | $8.71 |
| SUME2014-036 | OPERATORSCREED | $18.82 | $4.75 |
| SUME2014-036 | OPERATORROLLER (EARTH) | $15.81 | $1.72 |
| SUME2014-036 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $15.18 | $3.07 |
| SUME2014-036 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $20.36 | $5.06 |
| SUME2014-036 | OPERATORBROOM/SWEEPER | $16.75 | $6.47 |
| SUME2014-036 | OPERATORBULLDOZER | $16.58 | $2.89 |
| SUME2014-036 | OPERATORLOADER | $17.18 | $4.72 |
| ENGI0004-005 | POWER EQUIPMENT OPERATORGRADER/BLADE, MILLING MACHINE, PAVER (ASPHALT, AGGREGATE, AND CONCRETE), ROLLER ASPHALT | $30.17 | $13.80 |
| SUME2014-036 | TRAFFIC CONTROLFLAGGER | $9.00 | $0.00 |
| SUME2014-036 | TRAFFIC CONTROLLABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.48 | $5.37 |
| SUME2014-036 | TRUCK DRIVERDUMP TRUCK | $14.35 | $6.33 |
| SUME2014-036 | TRUCK DRIVERTACKTRUCK | $18.82 | $8.29 |