Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Highway
Covers 1 county in Maine: Kennebec. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUME2014-032 | CARPENTER, INCLUDES FORM WORK | $18.34 | $2.84 |
| SUME2014-032 | HIGHWAY/PARKING LOT STRIPINGLABORER | $14.80 | $1.27 |
| SUME2014-032 | IRONWORKER, REINFORCING | $16.27 | $0.00 |
| SUME2014-032 | LABORERASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $15.06 | $2.72 |
| SUME2014-032 | LABORERCOMMON OR GENERAL | $14.02 | $2.16 |
| SUME2014-032 | LABORERLANDSCAPE | $18.69 | $2.70 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| SUME2014-032 | LABORERWHEELMAN | $15.64 | $4.29 |
| SUME2014-032 | OPERATORSCREED | $19.43 | $4.90 |
| SUME2014-032 | OPERATORROLLER (EARTH) | $16.43 | $3.40 |
| SUME2014-032 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $19.52 | $5.15 |
| SUME2014-032 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $21.98 | $4.85 |
| SUME2014-032 | OPERATORBROOM/SWEEPER | $19.09 | $5.20 |
| SUME2014-032 | OPERATORBULLDOZER | $17.30 | $3.50 |
| SUME2014-032 | OPERATORLOADER | $18.59 | $5.53 |
| SUME2014-032 | OPERATORMECHANIC | $21.91 | $8.55 |
| ENGI0004-005 | POWER EQUIPMENT OPERATORGRADER/BLADE, MILLING MACHINE, PAVER (ASPHALT, AGGREGATE, AND CONCRETE), ROLLER ASPHALT | $30.17 | $13.80 |
| SUME2014-032 | TRAFFIC CONTROLFLAGGER | $9.38 | $0.00 |
| SUME2014-032 | TRAFFIC CONTROLLABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.47 | $4.80 |
| SUME2014-032 | TRUCK DRIVERDUMP TRUCK | $14.32 | $5.81 |
| SUME2014-032 | TRUCK DRIVERTACKTRUCK | $20.18 | $7.75 |