Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Heavy
Covers 1 county in Maine: Cumberland. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUME2014-011 | CARPENTER | $19.51 | $6.24 |
| SUME2014-011 | ELECTRICIAN | $25.24 | $7.01 |
| IRON0007-032 | IRONWORKER, REINFORCING | $33.65 | $26.27 |
| SUME2014-011 | IRONWORKER, STRUCTURAL | $23.47 | $11.63 |
| SUME2014-011 | LABORERPIPELAYER | $21.84 | $6.42 |
| SUME2014-011 | LABORERASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $13.38 | $1.39 |
| SUME2014-011 | LABORER |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $15.82 |
| $5.16 |
| SUME2014-011 | LABORERCONCRETE WORKER (INCLUDES REMOVING FORMS, DEMOLITION OF EXISTING CONCRETE, AND POURING, LEVELING AND FINISHING CONCRETE) | $24.35 | $15.65 |
| SUME2014-011 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $19.99 | $9.96 |
| SUME2014-011 | OPERATORBULLDOZER | $21.06 | $4.67 |
| SUME2014-011 | OPERATORCRANE | $24.74 | $8.03 |
| SUME2014-011 | OPERATORLOADER | $21.15 | $4.33 |
| SUME2014-011 | OPERATORROLLER | $16.61 | $3.44 |
| SUME2014-011 | PAINTER(BRUSH AND ROLLER) | $22.18 | $6.33 |
| SUME2014-011 | TRUCK DRIVERDUMP TRUCK | $16.21 | $3.27 |