Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Heavy
Covers 1 county in Maine: Androscoggin. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUME2014-010 | CARPENTER | $19.89 | $8.23 |
| SUME2014-010 | ELECTRICIAN | $25.24 | $7.01 |
| IRON0007-032 | IRONWORKER, REINFORCING | $33.65 | $26.27 |
| SUME2014-010 | IRONWORKER, STRUCTURAL | $23.47 | $11.63 |
| SUME2014-010 | LABORERPIPELAYER | $21.84 | $6.42 |
| SUME2014-010 | LABORERASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $13.38 | $1.39 |
| SUME2014-010 | LABORER |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $14.75 |
| $3.66 |
| SUME2014-010 | LABORERCONCRETE WORKER (INCLUDES REMOVING FORMS, DEMOLITION OF EXISTING CONCRETE, AND POURING, LEVELING AND FINISHING CONCRETE) | $24.35 | $15.65 |
| SUME2014-010 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $20.09 | $10.85 |
| SUME2014-010 | OPERATORBULLDOZER | $20.81 | $4.37 |
| SUME2014-010 | OPERATORCRANE | $24.78 | $8.13 |
| SUME2014-010 | OPERATORLOADER | $19.28 | $3.79 |
| SUME2014-010 | OPERATORROLLER | $16.61 | $3.44 |
| SUME2014-010 | PAINTER(BRUSH AND ROLLER) | $22.18 | $6.33 |
| SUME2014-010 | TRUCK DRIVERDUMP TRUCK | $15.41 | $3.17 |