Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Heavy
Covers 1 county in Maine: Waldo. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUME2014-007 | CARPENTER, INCLUDES FORM WORK | $20.04 | $10.48 |
| SUME2014-007 | ELECTRICIAN | $24.94 | $9.00 |
| SUME2014-007 | IRONWORKER, STRUCTURAL | $24.57 | $11.13 |
| LABO0327-002 | LABORERFLAGGER | $25.40 | $21.28 |
| SUME2014-007 | LABORERPIPELAYER | $21.96 | $5.99 |
| SUME2014-007 | LABORERCOMMON OR GENERAL | $15.52 | $6.60 |
| SUME2014-007 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| OPERATORCRANE |
| $24.57 |
| $6.89 |
| ENGI0004-002 | POWER EQUIPMENT OPERATORBACKHOE,EXCAVATOR, LOADER, TRACKHOE | $43.86 | $33.86 |
| ENGI0004-002 | POWER EQUIPMENT OPERATORBULLDOZER | $43.60 | $33.86 |
| SUME2014-007 | TRUCK DRIVERDUMP TRUCK | $15.40 | $3.09 |