Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Maine: Kennebec. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BRMA0003-013 | BRICKLAYER | $43.91 | $28.47 |
| SUME2014-018 | CARPENTER, INCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION | $19.42 | $11.52 |
| SUME2014-018 | CEMENT MASON/CONCRETE FINISHER | $16.13 | $3.82 |
| SUME2014-018 | DRYWALL FINISHER/TAPER | $16.84 | $2.87 |
| SUME2014-018 | ELECTRICIAN | $25.13 | $9.57 |
| SUME2014-018 | ELEVATOR MECHANIC | $48.22 | $24.95 |
| IRON0007-034 | IRONWORKERORNAMENTAL AND REINFORCING |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $33.65 |
| $26.27 |
| SUME2014-018 | IRONWORKER, STRUCTURAL | $18.84 | $1.81 |
| LABO0327-003 | LABORERCOMMON OR GENERAL (INDUSTRIAL WORK ONLY) | $21.90 | $19.72 |
| SUME2014-018 | LABORERCOMMON OR GENERAL | $15.49 | $7.07 |
| SUME2014-018 | LABORERMASON TENDER - BRICK | $18.33 | $2.01 |
| SUME2014-018 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $20.42 | $3.12 |
| SUME2014-018 | OPERATORCRANE | $23.98 | $7.46 |
| SUME2014-018 | PAINTER(BRUSH AND ROLLER) | $15.86 | $2.66 |
| SUME2014-018 | PLUMBER, INCLUDES HVAC PIPE INSTALLATION | $20.08 | $3.70 |
| SUME2014-018 | SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $16.97 | $1.92 |
| SUME2014-018 | TRUCK DRIVERDUMP TRUCK | $14.79 | $2.53 |