Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Maine: Hancock. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUME2014-017 | BRICKLAYER | $27.38 | $9.14 |
| SUME2014-017 | CARPENTER, INCLUDES FORM WORK | $15.22 | $2.46 |
| SUME2014-017 | CEMENT MASON/CONCRETE FINISHER | $16.13 | $3.82 |
| SUME2014-017 | ELECTRICIAN | $22.78 | $7.35 |
| IRON0007-035 | IRONWORKERORNAMENTAL, REINFORCING AND STRUCTURAL | $33.65 | $26.27 |
| LABO0327-003 | LABORERCOMMON OR GENERAL (INDUSTRIAL WORK ONLY) | $21.90 | $19.72 |
| SUME2014-017 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| LABORERCOMMON OR GENERAL |
| $14.85 |
| $4.96 |
| SUME2014-017 | LABORERMASON TENDER - BRICK | $18.33 | $2.01 |
| SUME2014-017 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $20.42 | $3.12 |
| SUME2014-017 | OPERATORCRANE | $24.07 | $6.08 |
| SUME2014-017 | PAINTER(BRUSH AND ROLLER) | $20.74 | $8.88 |
| PLUM0716-001 | PIPEFITTER | $40.00 | $24.71 |
| SUME2014-017 | SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $16.97 | $1.92 |
| SUME2014-017 | TRUCK DRIVERDUMP TRUCK | $14.79 | $2.53 |