Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 1 county in Maryland: St Mary's. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUMD2012-028 | BRICKLAYER(INSULATOR FOAM) | $19.77 | $0.00 |
| SUMD2012-028 | CARPENTER, EXCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION | $19.20 | $3.48 |
| SUMD2012-028 | CEMENT MASON/CONCRETE FINISHER | $16.40 | $2.00 |
| SUMD2012-028 | DRYWALL HANGER AND METAL STUD INSTALLER | $19.28 | $0.00 |
| SUMD2012-028 | ELECTRICIAN | $27.01 | $8.16 |
| SUMD2012-028 | IRONWORKER, ORNAMENTAL | $17.31 | $0.00 |
| SUMD2012-028 | LABORER |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $12.25 |
| $2.75 |
| SUMD2012-028 | LABORERPIPELAYER | $16.19 | $2.15 |
| SUMD2012-028 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $21.46 | $2.81 |
| SUMD2012-028 | OPERATORLOADER | $20.25 | $2.06 |
| SUMD2012-028 | PAINTER(BRUSH AND ROLLER) | $16.71 | $0.00 |
| SUMD2012-028 | PLUMBER(HVAC PIPE AND UNIT INSTALLATION ONLY) | $18.80 | $6.63 |
| SUMD2012-028 | PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION | $26.00 | $6.67 |
| SUMD2012-028 | ROOFER | $19.40 | $4.28 |
| SUMD2012-028 | SHEET METAL WORKER(HVAC DUCT INSTALLATION ONLY) | $19.89 | $1.20 |
| SUMD2012-028 | SPRINKLER FITTER(FIRE SPRINKLERS) | $20.75 | $2.85 |
| SUMD2012-028 | TILE SETTER | $14.50 | $0.00 |