Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 1 county in Maryland: Baltimore City. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUMD2012-021 | BRICKLAYER(INSULATOR FOAM) | $21.60 | $0.00 |
| SUMD2012-021 | CARPENTER, EXCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION | $19.41 | $3.11 |
| SUMD2012-021 | CEMENT MASON/CONCRETE FINISHER | $18.92 | $0.00 |
| SUMD2012-021 | DRYWALL HANGER AND METAL STUD INSTALLER | $16.36 | $0.62 |
| SUMD2012-021 | ELECTRICIAN | $22.59 | $0.81 |
| CARP0251-007 | FLOOR LAYERCARPET | $34.12 | $14.64 |
| SUMD2012-021 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| IRONWORKER, ORNAMENTAL |
| $17.31 |
| $0.00 |
| SUMD2012-021 | LABORERPIPELAYER | $16.19 | $2.15 |
| SUMD2012-021 | LABORERCOMMON OR GENERAL, INCLUDING BRICK MASON TENDING AND CEMENT MASON TENDING | $13.81 | $0.00 |
| SUMD2012-021 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $18.40 | $4.42 |
| SUMD2012-021 | OPERATORLOADER | $20.25 | $2.06 |
| SUMD2012-021 | PAINTER(BRUSH AND ROLLER), INCLUDES DRYWALL FINISHING/TAPING | $15.23 | $0.70 |
| SUMD2012-021 | PLUMBER(HVAC PIPE INSTALLATION ONLY) | $17.60 | $0.00 |
| SUMD2012-021 | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $20.48 | $0.00 |
| SUMD2012-021 | ROOFER | $26.80 | $0.00 |
| SUMD2012-021 | SHEET METAL WORKER(HVAC DUCT INSTALLATION ONLY) | $18.82 | $1.20 |
| SUMD2012-021 | SPRINKLER FITTER(FIRE SPRINKLERS) | $26.06 | $6.52 |