Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Highway
Covers 1 county in Massachusetts: Worcester. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| CARP0336-004 | CARPENTER(INCLUDES FORM WORK) | $50.10 | $31.45 |
| SUMA2014-015 | CEMENT MASON/CONCRETE FINISHER | $56.70 | $21.08 |
| ELEC0103-007 | ELECTRICIAN | $66.17 | $37.08 |
| IRON0007-029 | IRONWORKERORNAMENTAL | $57.57 | $37.67 |
| SUMA2014-015 | IRONWORKER, REINFORCING | $56.48 | $20.62 |
| IRON0007-028 | IRONWORKER, STRUCTURAL | $57.57 | $37.67 |
| LABO0039-003 | LABORER |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $33.25 |
| $22.92 |
| LABO0039-003 | LABORERASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $33.50 | $22.92 |
| LABO0039-003 | LABORER(GUARDRAIL INSTALLATION) | $33.50 | $22.92 |
| SUMA2014-015 | LABORERCONCRETE SAW (HAND HELD/WALK BEHIND) | $41.78 | $18.37 |
| SUMA2014-015 | LABORERLANDSCAPE | $40.39 | $17.68 |
| SUMA2014-015 | OPERATORCRANE | $52.14 | $21.08 |
| SUMA2014-015 | OPERATORPILEDRIVER | $44.46 | $16.94 |
| SUMA2014-015 | OPERATORMECHANIC | $48.14 | $17.02 |
| SUMA2014-015 | OPERATORFORKLIFT | $64.67 | $0.00 |
| PAIN0035-023 | PAINTERSTEEL | $56.76 | $36.00 |
| SUMA2014-015 | PAINTERSPRAY (LINESTRIPING) | $48.00 | $0.00 |
| SUMA2014-015 | PILEDRIVERMAN | $45.65 | $23.33 |
| ENGI0004-030 | POWER EQUIPMENT OPERATORGROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; GRADALL; LOADER; PAVER (ASPHALT, AGGREGATE, AND CONCRETE); POST DRIVER (GUARDRAIL/FENCES) FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY | $57.83 | $33.70 |
| ENGI0004-031 | POWER EQUIPMENT OPERATORMILLING MACHINE FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY | $57.83 | $33.70 |
| ENGI0004-030 | POWER EQUIPMENT OPERATOR GROUP 2 BULLDOZER; GRADER/BLADE; ROLLER FOOTNOTE FOR POWER EQUIPMENT OPERATORSA. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY | $57.18 | $33.70 |
| SUMA2014-015 | TRAFFIC CONTROLFLAGGER | $23.00 | $20.44 |
| SUMA2014-015 | TRAFFIC CONTROLLABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $44.49 | $12.41 |
| SUMA2014-015 | TRUCK DRIVERCONCRETE TRUCK | $33.69 | $15.79 |
| SUMA2014-015 | TRUCK DRIVERDUMP TRUCK | $30.38 | $7.20 |
| SUMA2014-015 | TRUCK DRIVERFLATBED TRUCK | $48.53 | $0.00 |