Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Highway
Covers 1 county in Massachusetts: Norfolk. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUMA2014-012 | CARPENTER, INCLUDES FORM WORK | $43.64 | $22.09 |
| SUMA2014-012 | CEMENT MASON/CONCRETE FINISHER | $56.70 | $21.08 |
| ELEC0103-003 | ELECTRICIAN(INCLUDES TRAFFIC SIGNALIZATION) | $66.17 | $37.08 |
| IRON0007-026 | IRONWORKERORNAMENTAL AND STRUCTURAL | $57.87 | $37.67 |
| SUMA2014-012 | IRONWORKER, REINFORCING | $44.52 | $19.36 |
| LABO0022-015 | LABORERCOMMON OR GENERAL | $38.95 | $29.70 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| LABO0022-015 |
| LABORERFENCE ERECTION |
| $38.95 |
| $29.70 |
| LABO0022-015 | LABORER(GUARDRAIL INSTALLATION) | $38.95 | $29.70 |
| LABO0022-015 | LABORER(LANDSCAPE) | $38.95 | $29.70 |
| LABO0133-001 | LABORERCONCRETE SURFACER | $46.20 | $29.85 |
| SUMA2014-012 | LABORERCONCRETE SAW (HAND HELD/WALK BEHIND) | $44.43 | $14.18 |
| SUMA2014-012 | LABORERASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $33.65 | $17.32 |
| SUMA2014-012 | LABORERJACK HAMMER | $38.69 | $17.33 |
| SUMA2014-012 | OPERATORMECHANIC | $48.74 | $11.79 |
| SUMA2014-012 | OPERATORPILEDRIVER | $42.56 | $17.34 |
| SUMA2014-012 | OPERATORFORKLIFT | $64.67 | $0.00 |
| PAIN0035-023 | PAINTERSTEEL | $56.76 | $36.00 |
| SUMA2014-012 | PAINTERSPRAY (LINESTRIPING) | $47.30 | $6.42 |
| ENGI0004-028 | POWER EQUIPMENT OPERATORGROUP 2 BULLDOZER; GRADER/BLADE; MILLING MACHINE; ROLLER | $57.18 | $33.70 |
| ENGI0004-028 | POWER EQUIPMENT OPERATORGROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; CRANE; GRADALL; PAVER (ASPHALT, AGGREGATE, AND CONCRETE); POST DRIVER (GUARDRAIL/FENCES) FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY | $57.83 | $33.70 |
| ENGI0004-029 | POWER EQUIPMENT OPERATORLOADER FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY | $57.83 | $33.70 |
| SUMA2014-012 | TRAFFIC CONTROLFLAGGER | $23.00 | $20.44 |
| SUMA2014-012 | TRAFFIC CONTROLLABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $53.35 | $12.78 |
| SUMA2014-012 | TRUCK DRIVERDUMP TRUCK | $37.74 | $11.86 |
| SUMA2014-012 | TRUCK DRIVERCONCRETE TRUCK | $33.69 | $15.79 |
| SUMA2014-012 | TRUCK DRIVERFLATBED TRUCK | $48.53 | $0.00 |