Revision 1 · modified May 18, 2026 · published May 18, 2026 · Highway
Covers 1 county in Massachusetts: Hampshire. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUMA2014-010 | CARPENTER, INCLUDES FORM WORK | $40.64 | $20.80 |
| SUMA2014-010 | CEMENT MASON/CONCRETE FINISHER | $52.13 | $20.89 |
| SUMA2014-010 | ELECTRICIAN | $47.13 | $13.41 |
| IRON0007-027 | IRONWORKERORNAMENTAL AND STRUCTURAL | $41.89 | $33.90 |
| SUMA2014-010 | IRONWORKER, REINFORCING | $46.21 | $21.27 |
| LABO0596-008 | LABORER(TRAFFIC CONTROL: FLAGGER) | $35.00 | $26.91 |
| LABO0999-003 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| LABORERCOMMON OR GENERAL |
| $35.00 |
| $26.91 |
| LABO0999-003 | LABORER(LANDSCAPE) | $35.00 | $26.91 |
| SUMA2014-010 | LABORERASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $33.10 | $18.09 |
| SUMA2014-010 | LABORERCONCRETE SAW (HAND HELD/WALK BEHIND) | $44.43 | $14.18 |
| SUMA2014-010 | OPERATORFORKLIFT | $51.63 | $0.00 |
| SUMA2014-010 | OPERATORMECHANIC | $48.14 | $17.02 |
| SUMA2014-010 | OPERATORPILEDRIVER | $43.87 | $18.04 |
| PAIN0035-023 | PAINTERSTEEL | $56.76 | $36.00 |
| SUMA2014-010 | PAINTERSPRAY (LINESTRIPING) | $37.50 | $18.83 |
| ENGI0004-019 | POWER EQUIPMENT OPERATORGROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; LOADER FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY | $57.18 | $33.70 |
| ENGI0004-019 | POWER EQUIPMENT OPERATOR GROUP 1 BROOM/SWEEPER; CRANE; GRADALL; POST DRIVER(GUARDRAIL/FENCES) FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY | $57.18 | $33.70 |
| ENGI0004-019 | POWER EQUIPMENT OPERATOR GROUP 2 BULLDOZER; GRADER/BLADE FOOTNOTE FOR POWER EQUIPMENT OPERATORSA. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY | $57.83 | $33.70 |
| ENGI0004-019 | POWER EQUIPMENT OPERATOR GROUP 2 MILLING MACHINE; PAVER(ASPHALT, AGGREGATE, AND CONCRETE) FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY | $57.83 | $33.70 |
| ENGI0098-010 | POWER EQUIPMENT OPERATOR GROUP 4 ROLLER FOOTNOTE FOR POWER EQUIPMENT OPERATORSA. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY | $39.12 | $31.04 |
| SUMA2014-010 | TRAFFIC CONTROLLABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $43.73 | $15.06 |
| SUMA2014-010 | TRUCK DRIVERCONCRETE TRUCK | $33.69 | $15.79 |
| SUMA2014-010 | TRUCK DRIVERDUMP TRUCK | $30.00 | $18.18 |
| SUMA2014-010 | TRUCK DRIVERFLATBED TRUCK | $48.53 | $0.00 |